X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505122612000

Well Details

Well ID: 0505122612000
Loading map...
Location: 00/12-26-050-12W5/0
Location Alias: 00/12-26-50-12 W5M
Location Alias 2: 00/12-26-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 26
County/Municipality: Yellowhead County
Well Name: VERMILION HZ PEMBINA 12-26-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0435941
License Date: 2011-08-11
License Status: Issued
Spud Date: 2011-08-30
Final Drill Date: 2011-09-08
Well Total Depth: 3540.00 m
Surface Hole Latitude: 53.350629
Surface Hole Longitude: -115.631947

For data sources see[1][2]

Well History

Date Event
2011-08-11 Obtained License
2011-08-30 Lost Circulation Occurred
2011-09-01 Surface Casing Operation Performed
2011-09-01 Well Log Performed
2011-09-02 Direction Drilling Operation Performed - Horizontal
2011-09-08 Finished Drilling
2011-09-08 Well Mode changed to Drilled and Cased
2011-09-10 Production Casing Operation Performed
2011-09-11 Rig Released
2011-10-01 Well Began Production
2011-10-01 Well Fluid changed to Crude Oil
2011-10-01 Well Mode changed to Pumping
2011-10-02 Well Log Performed
2011-10-09 Perforation Treatment Performed - Open-Hole Completion
2011-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-11 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-02 1198.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-09 Open Hole/Barefoot Completion 3536.00 3540.00 0
2011-10-10 Multi-Stage Fracture 2686.80 2686.90 0
2011-10-10 Multi-Stage Fracture 2574.40 2574.50 0
2011-10-10 Multi-Stage Fracture 2475.50 2475.60 0
2011-10-11 Multi-Stage Fracture 2363.10 2363.20 0
2011-10-11 Multi-Stage Fracture 2264.20 2264.30 0
2011-10-11 Multi-Stage Fracture 2165.30 2165.40 0
2011-10-10 Multi-Stage Fracture 3497.70 3497.80 0
2011-10-10 Multi-Stage Fracture 3405.40 3405.50 0
2011-10-10 Multi-Stage Fracture 3306.80 3306.90 0
2011-10-10 Multi-Stage Fracture 3194.60 3194.70 0
2011-10-10 Multi-Stage Fracture 3095.60 3095.70 0
2011-10-10 Multi-Stage Fracture 2996.90 2997.00 0
2011-10-10 Multi-Stage Fracture 2884.70 2884.80 0
2011-10-10 Multi-Stage Fracture 2785.70 2785.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1242 0.0 0.0 0.0
2012 8627 0.0 0.0 0.0
2013 8480 0.0 0.0 0.0
2014 8543 0.0 0.0 0.0
2015 8726 0.0 0.0 0.0
2016 8588 0.0 0.0 0.0
2017 8464 0.0 0.0 0.0
2018 8582 0.0 0.0 0.0
2019 8162 0.0 0.0 0.0
2020 1453 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-08-30 Lost Circulation 30.00 30.00

For data sources see[7]

References