If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505122605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.34621,"lon":-115.636505,"icon":""}]} |
Location: 00/05-26-050-12W5/0 | |
Location Alias: 00/05-26-50-12 W5M | |
Location Alias 2: 00/05-26-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 26 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION HZ PEMBINA 5-26-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0435590 | |
License Date: 2011-07-28 | |
License Status: Issued | |
Spud Date: 2011-09-06 | |
Final Drill Date: 2011-09-14 | |
Well Total Depth: 3081.00 m | |
Surface Hole Latitude: 53.346210 | |
Surface Hole Longitude: -115.636505 |
Date | Event |
---|---|
2011-07-28 | Obtained License |
2011-09-08 | Surface Casing Operation Performed |
2011-09-09 | Direction Drilling Operation Performed - Horizontal |
2011-09-14 | Finished Drilling |
2011-09-14 | Well Mode changed to Drilled and Cased |
2011-09-15 | Production Casing Operation Performed |
2011-09-16 | Rig Released |
2011-09-30 | Well Log Performed |
2011-10-01 | Well Began Production |
2011-10-01 | Well Fluid changed to Crude Oil |
2011-10-01 | Well Mode changed to Pumping |
2011-10-04 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-05 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-09 | 1448.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-04 | Open Hole/Barefoot Completion | 3076.00 | 3081.00 | 0 |
2011-10-05 | Multi-Stage Fracture | 2251.00 | 2251.10 | 0 |
2011-10-05 | Multi-Stage Fracture | 2151.50 | 2151.60 | 0 |
2011-10-05 | Multi-Stage Fracture | 2052.10 | 2052.20 | 0 |
2011-10-05 | Multi-Stage Fracture | 3064.50 | 3064.60 | 0 |
2011-10-05 | Multi-Stage Fracture | 2982.20 | 2982.30 | 0 |
2011-10-05 | Multi-Stage Fracture | 2870.80 | 2870.90 | 0 |
2011-10-05 | Multi-Stage Fracture | 2771.30 | 2771.40 | 0 |
2011-10-05 | Multi-Stage Fracture | 2671.90 | 2672.00 | 0 |
2011-10-05 | Multi-Stage Fracture | 2560.70 | 2560.80 | 0 |
2011-10-05 | Multi-Stage Fracture | 2461.20 | 2461.30 | 0 |
2011-10-05 | Multi-Stage Fracture | 2350.20 | 2350.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1037 | 0.0 | 0.0 | 0.0 |
2012 | 8598 | 0.0 | 0.0 | 0.0 |
2013 | 8535 | 0.0 | 0.0 | 0.0 |
2014 | 8613 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8567 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8745 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]