X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505122516000

Well Details

Well ID: 0505122516000
Loading map...
Location: 00/16-25-050-12W5/0
Location Alias: 00/16-25-50-12 W5M
Location Alias 2: 00/16-25-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 25
County/Municipality: Yellowhead County
Well Name: VERMILION HZ PEMBINA 16-25-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0440745
License Date: 2011-12-09
License Status: Amended
Spud Date: 2012-04-08
Final Drill Date: 2012-04-17
Well Total Depth: 3614.00 m
Surface Hole Latitude: 53.346577
Surface Hole Longitude: -115.636952

For data sources see[1][2]

Well History

Date Event
2011-12-09 Obtained License
2012-04-08 Lost Circulation Occurred
2012-04-10 Surface Casing Operation Performed
2012-04-11 Direction Drilling Operation Performed - Deviate
2012-04-12 Direction Drilling Operation Performed - Horizontal
2012-04-17 Finished Drilling
2012-04-17 Well Mode changed to Drilled and Cased
2012-04-18 Production Casing Operation Performed
2012-04-20 Rig Released
2012-07-02 Perforation Treatment Performed - Open-Hole Completion
2012-07-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-01 Well Began Production
2012-08-01 Well Fluid changed to Crude Oil
2012-08-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-04-11 1371.00 Deviate (5 - 79 degrees)
2012-04-12 2124.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-02 Open Hole/Barefoot Completion 3612.00 3614.00 0
2012-07-04 Multi-Stage Fracture 2554.00 2554.10 0
2012-07-04 Multi-Stage Fracture 2447.60 2447.70 0
2012-07-04 Multi-Stage Fracture 2343.00 2343.10 0
2012-07-04 Multi-Stage Fracture 2249.40 2249.50 0
2012-07-03 Multi-Stage Fracture 3502.50 3502.60 0
2012-07-03 Multi-Stage Fracture 3393.00 3393.10 0
2012-07-03 Multi-Stage Fracture 3286.80 3286.90 0
2012-07-03 Multi-Stage Fracture 3182.40 3182.50 0
2012-07-03 Multi-Stage Fracture 3077.70 3077.80 0
2012-07-04 Multi-Stage Fracture 2866.00 2866.10 0
2012-07-04 Multi-Stage Fracture 2761.90 2762.00 0
2012-07-04 Multi-Stage Fracture 2657.90 2658.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2671 0.0 0.0 0.0
2013 8606 0.0 0.0 0.0
2014 7972 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8629 0.0 0.0 0.0
2017 8751 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8745 0.0 0.0 0.0
2020 2082 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-08 Lost Circulation 222.00 222.00
2012-07-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References