X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505122010000

Well Details

Well ID: 0505122010000
Loading map...
Location: 00/10-20-050-12W5/0
Location Alias: 00/10-20-50-12 W5M
Location Alias 2: 00/10-20-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 20
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 10-20-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0458972
License Date: 2013-08-29
License Status: Issued
Spud Date: 2014-01-02
Final Drill Date: 2014-01-16
Well Total Depth: 4095.00 m
Surface Hole Latitude: 53.352918
Surface Hole Longitude: -115.714696

For data sources see[1][2]

Well History

Date Event
2013-08-29 Obtained License
2014-01-03 Surface Casing Operation Performed
2014-01-04 Direction Drilling Operation Performed - Deviate
2014-01-07 Direction Drilling Operation Performed - Horizontal
2014-01-10 Well Log Performed
2014-01-16 Finished Drilling
2014-01-16 Well Mode changed to Drilled and Cased
2014-01-17 Well Began Production
2014-01-17 Well Fluid changed to Crude Oil
2014-01-17 Well Mode changed to Pumping
2014-01-18 Production Casing Operation Performed
2014-01-18 Rig Released
2014-01-21 Well Log Performed
2014-01-27 Perforation Treatment Performed - Open-Hole Completion
2014-01-28 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-02 Nabors Drilling Limited 19 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-01-04 758.00 Deviate (5 - 79 degrees)
2014-01-07 1961.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-01-27 Open Hole/Barefoot Completion 4091.00 4095.00 0
2014-01-28 Multi-Stage Fracture 3457.30 3457.40 0
2014-01-28 Multi-Stage Fracture 3384.70 3384.80 0
2014-01-28 Multi-Stage Fracture 3310.40 3310.50 0
2014-01-28 Multi-Stage Fracture 3234.10 3234.20 0
2014-01-28 Multi-Stage Fracture 3160.60 3160.70 0
2014-01-28 Multi-Stage Fracture 3087.10 3087.20 0
2014-01-28 Multi-Stage Fracture 3026.10 3026.20 0
2014-01-28 Multi-Stage Fracture 2950.30 2950.40 0
2014-01-28 Multi-Stage Fracture 2875.50 2875.60 0
2014-01-28 Multi-Stage Fracture 2800.40 2800.50 0
2014-01-28 Multi-Stage Fracture 4014.10 4014.20 0
2014-01-28 Multi-Stage Fracture 2725.50 2725.60 0
2014-01-28 Multi-Stage Fracture 2663.40 2663.50 0
2014-01-28 Multi-Stage Fracture 2590.70 2590.80 0
2014-01-28 Multi-Stage Fracture 2516.20 2516.30 0
2014-01-28 Multi-Stage Fracture 2441.00 2441.10 0
2014-01-28 Multi-Stage Fracture 2365.10 2365.20 0
2014-01-28 Multi-Stage Fracture 2304.50 2304.60 0
2014-01-28 Multi-Stage Fracture 2230.00 2230.10 0
2014-01-28 Multi-Stage Fracture 2155.40 2155.50 0
2014-01-28 Multi-Stage Fracture 2108.70 2108.80 0
2014-01-28 Multi-Stage Fracture 3965.70 3965.80 0
2014-01-28 Multi-Stage Fracture 3891.30 3891.40 0
2014-01-28 Multi-Stage Fracture 3816.30 3816.40 0
2014-01-28 Multi-Stage Fracture 3740.20 3740.30 0
2014-01-28 Multi-Stage Fracture 3664.60 3664.70 0
2014-01-28 Multi-Stage Fracture 3604.50 3604.60 0
2014-01-28 Multi-Stage Fracture 3531.60 3531.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-01-28 2014-01-28 1,820 3,938 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 5.0447 N/A
water Not Available 100 83.4754 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 11.361 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4751 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0332 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1795 N/A
water Not Available 100 0.1795 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0674 N/A
propylene glycol 57-55-6 100 0.0674 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.089 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.089 N/A
non-hazardous ingredients Not Available 100 0.089 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0725 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.0933 N/A
aminofunctional polymer 8985 100 0.0933 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0933 N/A
isopropanol 67-63-0 100 0.0933 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-01-24 2014-01-27 Groundwater - Non-saline less than or equal to 150m deep 3079
2014-01-24 2014-01-27 Recycled Fracturing Water (treated at well site) 1088
2014-01-24 2014-01-24 Recycled Fracturing Water (treated at well site) 449

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 7297 0.0 0.0 0.0
2015 8710 0.0 0.0 0.0
2016 8631 0.0 0.0 0.0
2017 8700 0.0 0.0 0.0
2018 8742 0.0 0.0 0.0
2019 8723 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-18 No Incident Encountered 0.00 0.00
2014-02-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References