If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505121007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.304213,"lon":-115.632983,"icon":""}]} |
Location: 00/07-10-050-12W5/0 | |
Location Alias: 00/07-10-50-12 W5M | |
Location Alias 2: 00/07-10-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 10 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION HZ PEMBINA 7-10-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0446532 | |
License Date: 2012-06-14 | |
License Status: Issued | |
Spud Date: 2012-07-13 | |
Final Drill Date: 2012-07-25 | |
Well Total Depth: 4270.00 m | |
Surface Hole Latitude: 53.304213 | |
Surface Hole Longitude: -115.632983 |
Date | Event |
---|---|
2012-06-14 | Obtained License |
2012-07-15 | Surface Casing Operation Performed |
2012-07-16 | Direction Drilling Operation Performed - Deviate |
2012-07-17 | Direction Drilling Operation Performed - Horizontal |
2012-07-17 | Well Log Performed |
2012-07-25 | Finished Drilling |
2012-07-25 | Well Log Performed |
2012-07-25 | Well Mode changed to Drilled and Cased |
2012-07-27 | Production Casing Operation Performed |
2012-07-28 | Rig Released |
2012-09-01 | Well Began Production |
2012-09-01 | Well Fluid changed to Crude Oil |
2012-09-01 | Well Mode changed to Pumping |
2012-09-09 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-11 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-13 | Ironhand Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-16 | 1526.50 | Deviate (5 - 79 degrees) |
2012-07-17 | 1903.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-09 | Open Hole/Barefoot Completion | 4231.00 | 4270.00 | 0 |
2012-09-11 | Multi-Stage Fracture | 3426.10 | 3426.20 | 0 |
2012-09-11 | Multi-Stage Fracture | 3340.70 | 3340.80 | 0 |
2012-09-11 | Multi-Stage Fracture | 3228.20 | 3228.30 | 0 |
2012-09-11 | Multi-Stage Fracture | 3116.70 | 3116.80 | 0 |
2012-09-11 | Multi-Stage Fracture | 3004.10 | 3004.20 | 0 |
2012-09-11 | Multi-Stage Fracture | 2892.90 | 2893.00 | 0 |
2012-09-11 | Multi-Stage Fracture | 2780.10 | 2780.20 | 0 |
2012-09-11 | Multi-Stage Fracture | 2669.40 | 2669.50 | 0 |
2012-09-11 | Multi-Stage Fracture | 2558.10 | 2558.20 | 0 |
2012-09-11 | Multi-Stage Fracture | 2445.40 | 2445.50 | 0 |
2012-09-10 | Multi-Stage Fracture | 4219.50 | 4219.60 | 0 |
2012-09-11 | Multi-Stage Fracture | 2332.50 | 2332.60 | 0 |
2012-09-11 | Multi-Stage Fracture | 2219.50 | 2219.60 | 0 |
2012-09-11 | Multi-Stage Fracture | 2120.20 | 2120.30 | 0 |
2012-09-11 | Multi-Stage Fracture | 2074.60 | 2074.70 | 0 |
2012-09-10 | Multi-Stage Fracture | 4142.70 | 4142.80 | 0 |
2012-09-10 | Multi-Stage Fracture | 4033.00 | 4033.10 | 0 |
2012-09-10 | Multi-Stage Fracture | 3933.60 | 3933.70 | 0 |
2012-09-10 | Multi-Stage Fracture | 3836.50 | 3836.60 | 0 |
2012-09-11 | Multi-Stage Fracture | 3738.50 | 3738.60 | 0 |
2012-09-11 | Multi-Stage Fracture | 3624.00 | 3624.10 | 0 |
2012-09-11 | Multi-Stage Fracture | 3524.60 | 3524.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1931 | 0.0 | 0.0 | 0.0 |
2013 | 8681 | 0.0 | 0.0 | 0.0 |
2014 | 8192 | 0.0 | 0.0 | 0.0 |
2015 | 8747 | 0.0 | 0.0 | 0.0 |
2016 | 8390 | 0.0 | 0.0 | 0.0 |
2017 | 8513 | 0.0 | 0.0 | 0.0 |
2018 | 8587 | 0.0 | 0.0 | 0.0 |
2019 | 8658 | 0.0 | 0.0 | 0.0 |
2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-28 | No Incident Encountered | 0.00 | 0.00 |
2012-09-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]