If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505120502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.30776,"lon":-115.715171,"icon":""}]} |
Location: 00/02-05-050-12W5/0 | |
Location Alias: 00/02-05-50-12 W5M | |
Location Alias 2: 00/02-05-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 05 | |
County/Municipality: Yellowhead County | |
Well Name: VEI HZ PEMBINA 2-5-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0458723 | |
License Date: 2013-08-20 | |
License Status: Amended | |
Spud Date: 2013-10-29 | |
Final Drill Date: 2013-11-14 | |
Well Total Depth: 4635.00 m | |
Surface Hole Latitude: 53.307760 | |
Surface Hole Longitude: -115.715171 |
Date | Event |
---|---|
2013-08-20 | Obtained License |
2013-10-30 | Surface Casing Operation Performed |
2013-11-01 | Direction Drilling Operation Performed - Deviate |
2013-11-02 | Direction Drilling Operation Performed - Horizontal |
2013-11-14 | Finished Drilling |
2013-11-14 | Well Log Performed |
2013-11-14 | Well Mode changed to Drilled and Cased |
2013-11-19 | Production Casing Operation Performed |
2013-11-19 | Rig Released |
2014-01-01 | Well Began Production |
2014-01-01 | Well Fluid changed to Crude Oil |
2014-01-01 | Well Mode changed to Pumping |
2014-01-05 | Well Log Performed |
2014-01-17 | Perforation Treatment Performed - Open-Hole Completion |
2014-01-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-01-19 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-10-29 | Nabors Drilling Limited | 15 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-11-01 | 1460.50 | Deviate (5 - 79 degrees) |
2013-11-02 | 1955.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-01-17 | Open Hole/Barefoot Completion | 4596.00 | 4635.00 | 0 |
2014-01-18 | Multi-Stage Fracture | 3870.20 | 3870.30 | 0 |
2014-01-18 | Multi-Stage Fracture | 3780.30 | 3780.40 | 0 |
2014-01-18 | Multi-Stage Fracture | 3690.40 | 3690.50 | 0 |
2014-01-18 | Multi-Stage Fracture | 3586.90 | 3587.00 | 0 |
2014-01-18 | Multi-Stage Fracture | 3497.20 | 3497.30 | 0 |
2014-01-18 | Multi-Stage Fracture | 3410.60 | 3410.70 | 0 |
2014-01-18 | Multi-Stage Fracture | 3321.80 | 3321.90 | 0 |
2014-01-18 | Multi-Stage Fracture | 3233.10 | 3233.20 | 0 |
2014-01-18 | Multi-Stage Fracture | 3133.00 | 3133.10 | 0 |
2014-01-18 | Multi-Stage Fracture | 3046.40 | 3046.50 | 0 |
2014-01-18 | Multi-Stage Fracture | 4585.00 | 4585.10 | 0 |
2014-01-18 | Multi-Stage Fracture | 2956.50 | 2956.60 | 0 |
2014-01-18 | Multi-Stage Fracture | 2864.90 | 2865.00 | 0 |
2014-01-19 | Multi-Stage Fracture | 2774.30 | 2774.40 | 0 |
2014-01-19 | Multi-Stage Fracture | 2683.20 | 2683.30 | 0 |
2014-01-19 | Multi-Stage Fracture | 2592.70 | 2592.80 | 0 |
2014-01-19 | Multi-Stage Fracture | 2504.60 | 2504.70 | 0 |
2014-01-19 | Multi-Stage Fracture | 2413.40 | 2413.50 | 0 |
2014-01-19 | Multi-Stage Fracture | 2322.60 | 2322.70 | 0 |
2014-01-19 | Multi-Stage Fracture | 2231.50 | 2231.60 | 0 |
2014-01-19 | Multi-Stage Fracture | 2140.30 | 2140.40 | 0 |
2014-01-18 | Multi-Stage Fracture | 4505.50 | 4505.60 | 0 |
2014-01-19 | Multi-Stage Fracture | 2049.10 | 2049.20 | 0 |
2014-01-19 | Multi-Stage Fracture | 1986.80 | 1986.90 | 0 |
2014-01-18 | Multi-Stage Fracture | 4418.70 | 4418.80 | 0 |
2014-01-18 | Multi-Stage Fracture | 4328.10 | 4328.20 | 0 |
2014-01-18 | Multi-Stage Fracture | 4237.40 | 4237.50 | 0 |
2014-01-18 | Multi-Stage Fracture | 4146.60 | 4146.70 | 0 |
2014-01-18 | Multi-Stage Fracture | 4043.80 | 4043.90 | 0 |
2014-01-18 | Multi-Stage Fracture | 3955.60 | 3955.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-01-18 | 2014-01-19 | 1,824 | 5,759 | N/A |
2 | 2014-01-18 | 2014-01-18 | 1,824 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 4.7517 | N/A | |||
water | Not Available | 100 | 86.7648 | N/A | ||||
Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 8.3305 | N/A | ||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 0.4213 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0107 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0107 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0107 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0107 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0107 | N/A | ||||
GBO-1 | Trican | Breaker | sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0344 | N/A | |
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1856 | N/A | |
water | Not Available | 100 | 0.1856 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0803 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0803 | N/A | ||||
FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0921 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0921 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0921 | N/A | ||||
GSI-1 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.079 | N/A | |
2 | SS-5 | Trican | Surfactant | aliphatic alcohol | 8985 | 100 | 0.0633 | N/A |
aminofunctional polymer | 8985 | 100 | 0.0633 | N/A | ||||
distillates (petroleum). sweet medium | 64741-86-2 | 100 | 0.0633 | N/A | ||||
isopropanol | 67-63-0 | 100 | 0.0633 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-01-16 | 2014-01-17 | Groundwater - Non-saline less than or equal to 150m deep | 5500 |
2014-01-18 | 2014-01-18 | Recycled Fracturing Water (treated at well site) | 1024 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 7354 | 0.0 | 0.0 | 0.0 |
2015 | 8722 | 0.0 | 0.0 | 0.0 |
2016 | 8560 | 0.0 | 0.0 | 0.0 |
2017 | 8493 | 0.0 | 0.0 | 0.0 |
2018 | 8213 | 0.0 | 0.0 | 0.0 |
2019 | 8394 | 0.0 | 0.0 | 0.0 |
2020 | 2078 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-11-19 | No Incident Encountered | 0.00 | 0.00 |
2014-01-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]