X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505120501000

Well Details

Well ID: 0505120501000
Loading map...
Location: 00/01-05-050-12W5/0
Location Alias: 00/01-05-50-12 W5M
Location Alias 2: 00/01-05-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 05
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 1-5-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0458726
License Date: 2013-08-21
License Status: Amended
Spud Date: 2013-10-10
Final Drill Date: 2013-10-24
Well Total Depth: 4495.00 m
Surface Hole Latitude: 53.307668
Surface Hole Longitude: -115.715006

For data sources see[1][2]

Well History

Date Event
2013-08-21 Obtained License
2013-10-12 Surface Casing Operation Performed
2013-10-14 Direction Drilling Operation Performed - Deviate
2013-10-15 Direction Drilling Operation Performed - Horizontal
2013-10-24 Finished Drilling
2013-10-24 Well Mode changed to Drilled and Cased
2013-10-25 Well Log Performed
2013-10-26 Production Casing Operation Performed
2013-10-27 Rig Released
2014-01-01 Well Began Production
2014-01-01 Well Fluid changed to Crude Oil
2014-01-01 Well Mode changed to Pumping
2014-01-15 Perforation Treatment Performed - Open-Hole Completion
2014-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-17 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-10-10 Nabors Drilling Limited 15 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-10-14 1435.00 Deviate (5 - 79 degrees)
2013-10-15 1994.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-01-15 Open Hole/Barefoot Completion 4473.00 4495.00 0
2014-01-16 Multi-Stage Fracture 3748.20 3748.30 0
2014-01-16 Multi-Stage Fracture 3660.60 3660.70 0
2014-01-17 Multi-Stage Fracture 3570.80 3570.90 0
2014-01-17 Multi-Stage Fracture 3479.60 3479.70 0
2014-01-17 Multi-Stage Fracture 3388.40 3388.50 0
2014-01-17 Multi-Stage Fracture 3299.60 3299.70 0
2014-01-17 Multi-Stage Fracture 3198.90 3199.00 0
2014-01-17 Multi-Stage Fracture 3110.70 3110.80 0
2014-01-17 Multi-Stage Fracture 3021.60 3021.70 0
2014-01-17 Multi-Stage Fracture 2920.10 2920.20 0
2014-01-16 Multi-Stage Fracture 4463.80 4463.90 0
2014-01-17 Multi-Stage Fracture 2834.30 2834.40 0
2014-01-17 Multi-Stage Fracture 2748.40 2748.50 0
2014-01-17 Multi-Stage Fracture 2650.90 2651.00 0
2014-01-17 Multi-Stage Fracture 2564.00 2564.10 0
2014-01-17 Multi-Stage Fracture 2463.80 2463.90 0
2014-01-17 Multi-Stage Fracture 2376.00 2376.10 0
2014-01-17 Multi-Stage Fracture 2276.70 2276.80 0
2014-01-17 Multi-Stage Fracture 2192.20 2192.30 0
2014-01-17 Multi-Stage Fracture 2092.40 2092.50 0
2014-01-17 Multi-Stage Fracture 2034.40 2034.50 0
2014-01-16 Multi-Stage Fracture 4400.80 4400.90 0
2014-01-16 Multi-Stage Fracture 4303.40 4303.50 0
2014-01-16 Multi-Stage Fracture 4218.20 4218.30 0
2014-01-16 Multi-Stage Fracture 4117.70 4117.80 0
2014-01-16 Multi-Stage Fracture 4034.00 4034.10 0
2014-01-16 Multi-Stage Fracture 3934.20 3934.30 0
2014-01-16 Multi-Stage Fracture 3846.90 3847.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-01-16 2014-01-17 1,820 5,629 N/A
2 2014-01-16 2014-01-16 1,820 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.9746 N/A
water Not Available 100 85.2214 N/A
Sand (20/40) Trican silica crystalline 14808-60-7 100 9.8515 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 0.4182 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0155 N/A
dibromoacetonitrile 3252-43-5 100 0.0155 N/A
non-hazardous ingredients Not Available 100 0.0155 N/A
polyethylene glycol 25322-68-3 100 0.0155 N/A
sodium bromide 7647-15-6 100 0.0155 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0341 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1861 N/A
water Not Available 100 0.1861 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0963 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0963 N/A
non-hazardous ingredients Not Available 100 0.0963 N/A
10355GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0487 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.1191 N/A
aminofunctional polymer 8985 100 0.1191 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.1191 N/A
isopropanol 67-63-0 100 0.1191 N/A
2 GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0948 N/A
propylene glycol 57-55-6 100 0.0948 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-01-14 2014-01-15 Groundwater - Non-saline less than or equal to 150m deep 5500
2014-01-19 2014-01-19 Recycled Fracturing Water (treated at well site) 208

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 7465 0.0 0.0 0.0
2015 8724 0.0 0.0 0.0
2016 8624 0.0 0.0 0.0
2017 8357 0.0 0.0 0.0
2018 8054 0.0 0.0 0.0
2019 8751 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-27 No Incident Encountered 0.00 0.00
2014-01-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References