If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505120311020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.291548,"lon":-115.709232,"icon":""}]} |
Location: 02/11-03-050-12W5/0 | |
Location Alias: 02/11-03-50-12 W5M | |
Location Alias 2: 02/11-03-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 03 | |
County/Municipality: Yellowhead County | |
Well Name: VEI HZTL PEMBINA 11-3-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0456068 | |
License Date: 2013-03-20 | |
License Status: Amended | |
Spud Date: 2013-10-03 | |
Final Drill Date: 2013-10-16 | |
Well Total Depth: 4302.00 m | |
Surface Hole Latitude: 53.291548 | |
Surface Hole Longitude: -115.709232 |
Date | Event |
---|---|
2013-03-20 | Obtained License |
2013-10-04 | Surface Casing Operation Performed |
2013-10-06 | Direction Drilling Operation Performed - Deviate |
2013-10-07 | Direction Drilling Operation Performed - Horizontal |
2013-10-16 | Finished Drilling |
2013-10-16 | Well Log Performed |
2013-10-16 | Well Mode changed to Drilled and Cased |
2013-10-18 | Production Casing Operation Performed |
2013-10-19 | Rig Released |
2013-10-22 | Well Log Performed |
2013-10-29 | Perforation Treatment Performed - Open-Hole Completion |
2013-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-10-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-01 | Well Began Production |
2013-11-01 | Well Fluid changed to Crude Oil |
2013-11-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-10-03 | Ironhand Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-10-06 | 1305.00 | Deviate (5 - 79 degrees) |
2013-10-07 | 2052.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-10-29 | Open Hole/Barefoot Completion | 4298.00 | 4302.00 | 0 |
2013-10-30 | Multi-Stage Fracture | 3718.80 | 3718.90 | 0 |
2013-10-30 | Multi-Stage Fracture | 3643.50 | 3643.60 | 0 |
2013-10-30 | Multi-Stage Fracture | 3582.50 | 3582.60 | 0 |
2013-10-30 | Multi-Stage Fracture | 3492.10 | 3492.20 | 0 |
2013-10-30 | Multi-Stage Fracture | 3386.60 | 3386.70 | 0 |
2013-10-30 | Multi-Stage Fracture | 3281.30 | 3281.40 | 0 |
2013-10-30 | Multi-Stage Fracture | 3204.50 | 3204.60 | 0 |
2013-10-31 | Multi-Stage Fracture | 3113.50 | 3113.60 | 0 |
2013-10-31 | Multi-Stage Fracture | 3037.10 | 3037.20 | 0 |
2013-10-31 | Multi-Stage Fracture | 2946.60 | 2946.70 | 0 |
2013-10-30 | Multi-Stage Fracture | 4274.60 | 4274.70 | 0 |
2013-10-31 | Multi-Stage Fracture | 2870.60 | 2870.70 | 0 |
2013-10-31 | Multi-Stage Fracture | 2779.70 | 2779.80 | 0 |
2013-10-31 | Multi-Stage Fracture | 2702.90 | 2703.00 | 0 |
2013-10-31 | Multi-Stage Fracture | 2612.00 | 2612.10 | 0 |
2013-10-31 | Multi-Stage Fracture | 2520.70 | 2520.80 | 0 |
2013-10-31 | Multi-Stage Fracture | 2443.90 | 2444.00 | 0 |
2013-10-31 | Multi-Stage Fracture | 2352.70 | 2352.80 | 0 |
2013-10-31 | Multi-Stage Fracture | 2277.10 | 2277.20 | 0 |
2013-10-31 | Multi-Stage Fracture | 2188.50 | 2188.60 | 0 |
2013-10-31 | Multi-Stage Fracture | 2126.60 | 2126.70 | 0 |
2013-10-30 | Multi-Stage Fracture | 4210.20 | 4210.30 | 0 |
2013-10-30 | Multi-Stage Fracture | 4148.00 | 4148.10 | 0 |
2013-10-30 | Multi-Stage Fracture | 4071.30 | 4071.40 | 0 |
2013-10-30 | Multi-Stage Fracture | 4009.00 | 4009.10 | 0 |
2013-10-30 | Multi-Stage Fracture | 3932.20 | 3932.30 | 0 |
2013-10-30 | Multi-Stage Fracture | 3856.10 | 3856.20 | 0 |
2013-10-30 | Multi-Stage Fracture | 3794.00 | 3794.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-30 | 2013-10-31 | 1,812 | 4,438 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 4.4045 | N/A | |||
water | 7732-18-5 | 100 | 83.8264 | N/A | ||||
Sand (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 10.7185 | N/A | ||
Sand (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 0.5296 | N/A | ||
PROBIO-100 | Trican | Bactericide/Biocide | non-hazardous ingredients | Not Available | 100 | 0.0638 | N/A | |
GBO-1 | Trican | Breaker | sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0335 | N/A | |
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1802 | N/A | |
water | 7732-18-5 | 100 | 0.1802 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0494 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0494 | N/A | ||||
FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0896 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0896 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0896 | N/A | ||||
10355GSI-1 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0597 | N/A | |
SS-4 | Trican | Surfactant | aliphatic alcohol | 8540 | 100 | 0.0885 | N/A | |
aminofunctional polymer | 8540 | 100 | 0.0885 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0885 | N/A | ||||
isopropanol | 67-63-0 | 100 | 0.0885 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-10-24 | 2013-10-26 | Groundwater - Non-saline less than or equal to 150m deep | 3233 |
2013-10-24 | 2013-10-26 | Recycled Fracturing Water (treated at well site) | 1280 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 713 | 0.0 | 0.0 | 0.0 |
2014 | 8535 | 0.0 | 0.0 | 0.0 |
2015 | 8730 | 0.0 | 0.0 | 0.0 |
2016 | 8400 | 0.0 | 0.0 | 0.0 |
2017 | 8727 | 0.0 | 0.0 | 0.0 |
2018 | 8747 | 0.0 | 0.0 | 0.0 |
2019 | 8418 | 0.0 | 0.0 | 0.0 |
2020 | 2005 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-10-19 | No Incident Encountered | 0.00 | 0.00 |
2013-11-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]