If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505120311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.291683,"lon":-115.709231,"icon":""}]} |
Location: 00/11-03-050-12W5/0 | |
Location Alias: 00/11-03-50-12 W5M | |
Location Alias 2: 00/11-03-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 03 | |
County/Municipality: Yellowhead County | |
Well Name: VEI HZ PEMBINA 11-3-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0456067 | |
License Date: 2013-03-20 | |
License Status: Issued | |
Spud Date: 2013-09-21 | |
Final Drill Date: 2013-09-30 | |
Well Total Depth: 4172.00 m | |
Surface Hole Latitude: 53.291683 | |
Surface Hole Longitude: -115.709231 |
Date | Event |
---|---|
2013-03-20 | Obtained License |
2013-09-22 | Surface Casing Operation Performed |
2013-09-24 | Direction Drilling Operation Performed - Deviate |
2013-09-25 | Direction Drilling Operation Performed - Horizontal |
2013-09-30 | Finished Drilling |
2013-09-30 | Well Log Performed |
2013-09-30 | Well Mode changed to Drilled and Cased |
2013-10-02 | Production Casing Operation Performed |
2013-10-02 | Rig Released |
2013-10-22 | Well Log Performed |
2013-10-30 | Perforation Treatment Performed - Open-Hole Completion |
2013-10-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-01 | Well Began Production |
2013-11-01 | Well Fluid changed to Crude Oil |
2013-11-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-09-21 | Ironhand Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-09-24 | 1444.00 | Deviate (5 - 79 degrees) |
2013-09-25 | 1964.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-10-30 | Open Hole/Barefoot Completion | 4168.50 | 4172.00 | 0 |
2013-10-31 | Multi-Stage Fracture | 3515.20 | 3515.30 | 0 |
2013-10-31 | Multi-Stage Fracture | 3440.50 | 3440.60 | 0 |
2013-10-31 | Multi-Stage Fracture | 3352.80 | 3352.90 | 0 |
2013-10-31 | Multi-Stage Fracture | 3278.10 | 3278.20 | 0 |
2013-10-31 | Multi-Stage Fracture | 3188.20 | 3188.30 | 0 |
2013-10-31 | Multi-Stage Fracture | 3115.20 | 3115.30 | 0 |
2013-10-31 | Multi-Stage Fracture | 3026.90 | 3027.00 | 0 |
2013-10-31 | Multi-Stage Fracture | 2952.70 | 2952.80 | 0 |
2013-10-31 | Multi-Stage Fracture | 2862.40 | 2862.50 | 0 |
2013-10-31 | Multi-Stage Fracture | 2788.30 | 2788.40 | 0 |
2013-10-31 | Multi-Stage Fracture | 4145.00 | 4145.10 | 0 |
2013-10-31 | Multi-Stage Fracture | 2712.60 | 2712.70 | 0 |
2013-11-01 | Multi-Stage Fracture | 2622.50 | 2622.60 | 0 |
2013-11-01 | Multi-Stage Fracture | 2549.20 | 2549.30 | 0 |
2013-11-01 | Multi-Stage Fracture | 2461.50 | 2461.60 | 0 |
2013-11-01 | Multi-Stage Fracture | 2387.30 | 2387.40 | 0 |
2013-11-01 | Multi-Stage Fracture | 2298.80 | 2298.90 | 0 |
2013-11-01 | Multi-Stage Fracture | 2224.00 | 2224.10 | 0 |
2013-11-01 | Multi-Stage Fracture | 2135.30 | 2135.40 | 0 |
2013-11-01 | Multi-Stage Fracture | 2063.30 | 2063.40 | 0 |
2013-11-01 | Multi-Stage Fracture | 1987.80 | 1987.90 | 0 |
2013-10-31 | Multi-Stage Fracture | 4081.20 | 4081.30 | 0 |
2013-10-31 | Multi-Stage Fracture | 4004.90 | 4005.00 | 0 |
2013-10-31 | Multi-Stage Fracture | 3916.50 | 3916.60 | 0 |
2013-10-31 | Multi-Stage Fracture | 3840.10 | 3840.20 | 0 |
2013-10-31 | Multi-Stage Fracture | 3751.00 | 3751.10 | 0 |
2013-10-31 | Multi-Stage Fracture | 3676.10 | 3676.20 | 0 |
2013-10-31 | Multi-Stage Fracture | 3601.30 | 3601.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-31 | 2013-11-01 | 1,808 | 4,236 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 3.7793 | N/A | |||
water | 7732-18-5 | 100 | 83.8265 | N/A | ||||
Sand (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 11.3524 | N/A | ||
Sand (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 0.5166 | N/A | ||
PROBIO-100 | Trican | Bactericide/Biocide | non-hazardous ingredients | Not Available | 100 | 0.0598 | N/A | |
GBO-1 | Trican | Breaker | sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0331 | N/A | |
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1796 | N/A | |
water | 7732-18-5 | 100 | 0.1796 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0478 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0478 | N/A | ||||
FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0893 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0893 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0893 | N/A | ||||
10355GSI-1 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0589 | N/A | |
SS-4 | Trican | Surfactant | aliphatic alcohol | 8540 | 100 | 0.105 | N/A | |
aminofunctional polymer | 8540 | 100 | 0.105 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.105 | N/A | ||||
isopropanol | 67-63-0 | 100 | 0.105 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-10-30 | 2013-10-31 | Groundwater - Non-saline less than or equal to 150m deep | 4523 |
2013-10-30 | 2013-10-31 | Recycled Fracturing Water (treated at well site) | 1380 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 828 | 0.0 | 0.0 | 0.0 |
2014 | 8572 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8611 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8739 | 0.0 | 0.0 | 0.0 |
2019 | 8651 | 0.0 | 0.0 | 0.0 |
2020 | 1903 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-10-02 | No Incident Encountered | 0.00 | 0.00 |
2013-11-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]