X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505062911000

Well Details

Well ID: 0505062911000
Loading map...
Location: 00/11-29-050-06W5/0
Location Alias: 00/11-29-50-06 W5M
Location Alias 2: 00/11-29-050-06 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 06
Section: 29
County/Municipality: Parkland County
Well Name: DAYLIGHT AMA HZ PEMBINA 11-29-50-6
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0417308
License Date: 2010-01-14
License Status: Amended
Spud Date: 2010-02-19
Final Drill Date: 2010-03-12
Well Total Depth: 2800.00 m
Surface Hole Latitude: 53.342953
Surface Hole Longitude: -114.827236

For data sources see[1][2]

Well History

Date Event
2010-01-14 Obtained License
2010-02-22 Surface Casing Operation Performed
2010-02-24 Direction Drilling Operation Performed - Horizontal
2010-03-04 Well Log Performed
2010-03-12 Finished Drilling
2010-03-12 Well Log Performed
2010-03-12 Well Mode changed to Drilled and Cased
2010-03-13 Well Log Performed
2010-03-19 Production Casing Operation Performed
2010-03-20 Rig Released
2010-03-29 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-29 Perforation Treatment Performed - Open-Hole Completion
2010-04-01 Well Began Production
2010-04-01 Well Fluid changed to Crude Oil
2010-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-24 725.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-29 Open Hole/Barefoot Completion 2795.00 2800.00 0
2010-03-29 Multi-Stage Fracture 2192.00 2192.10 0
2010-03-29 Multi-Stage Fracture 2123.40 2123.50 0
2010-03-29 Multi-Stage Fracture 2042.20 2042.30 0
2010-03-29 Multi-Stage Fracture 1973.10 1973.20 0
2010-03-29 Multi-Stage Fracture 1892.30 1892.40 0
2010-03-29 Multi-Stage Fracture 1823.20 1823.30 0
2010-03-29 Multi-Stage Fracture 1741.90 1742.00 0
2010-03-29 Multi-Stage Fracture 1672.80 1672.90 0
2010-03-29 Multi-Stage Fracture 2771.00 2771.10 0
2010-03-29 Multi-Stage Fracture 2720.50 2720.60 0
2010-03-29 Multi-Stage Fracture 2639.70 2639.80 0
2010-03-29 Multi-Stage Fracture 2570.20 2570.30 0
2010-03-29 Multi-Stage Fracture 2491.50 2491.60 0
2010-03-29 Multi-Stage Fracture 2422.90 2423.00 0
2010-03-29 Multi-Stage Fracture 2342.40 2342.50 0
2010-03-29 Multi-Stage Fracture 2273.20 2273.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6390 0.0 0.0 0.0
2011 8596 0.0 0.0 0.0
2012 8358 0.0 0.0 0.0
2013 8736 0.0 0.0 0.0
2014 8424 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-03-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References