X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505061515000

Well Details

Well ID: 0505061515000
Loading map...
Location: 00/15-15-050-06W5/0
Location Alias: 00/15-15-50-06 W5M
Location Alias 2: 00/15-15-050-06 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 06
Section: 15
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ PEMBINA 15-15-50-6
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0421583
License Date: 2010-07-02
License Status: Issued
Spud Date: 2010-07-11
Final Drill Date: 2010-07-21
Well Total Depth: 2897.00 m
Surface Hole Latitude: 53.309624
Surface Hole Longitude: -114.780744

For data sources see[1][2]

Well History

Date Event
2010-07-02 Obtained License
2010-07-12 Surface Casing Operation Performed
2010-07-14 Direction Drilling Operation Performed - Horizontal
2010-07-16 Well Log Performed
2010-07-17 Intermediate Casing Operation Performed
2010-07-21 Finished Drilling
2010-07-21 Well Log Performed
2010-07-21 Well Mode changed to Drilled and Cased
2010-07-24 Liner Casing Operation Performed
2010-07-25 Rig Released
2010-08-01 Well Log Performed
2010-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-08 Perforation Treatment Performed - Open-Hole Completion
2010-08-19 Well Began Production
2010-08-19 Well Fluid changed to Crude Oil
2010-08-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-14 700.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-08 Open Hole/Barefoot Completion 2892.00 2897.00 0
2010-08-08 Multi-Stage Fracture 2280.80 2280.90 0
2010-08-08 Multi-Stage Fracture 2221.10 2221.20 0
2010-08-08 Multi-Stage Fracture 2134.60 2134.70 0
2010-08-08 Multi-Stage Fracture 2062.30 2062.40 0
2010-08-08 Multi-Stage Fracture 1989.10 1989.20 0
2010-08-08 Multi-Stage Fracture 1916.70 1916.80 0
2010-08-08 Multi-Stage Fracture 1844.60 1844.70 0
2010-08-08 Multi-Stage Fracture 1772.10 1772.20 0
2010-08-08 Multi-Stage Fracture 1698.90 1699.00 0
2010-08-08 Multi-Stage Fracture 1626.70 1626.80 0
2010-08-08 Multi-Stage Fracture 2869.20 2869.30 0
2010-08-08 Multi-Stage Fracture 2790.10 2790.20 0
2010-08-08 Multi-Stage Fracture 2717.20 2717.30 0
2010-08-08 Multi-Stage Fracture 2644.80 2644.90 0
2010-08-08 Multi-Stage Fracture 2572.00 2572.10 0
2010-08-08 Multi-Stage Fracture 2499.40 2499.50 0
2010-08-08 Multi-Stage Fracture 2426.70 2426.80 0
2010-08-08 Multi-Stage Fracture 2353.80 2353.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3205 0.0 0.0 0.0
2011 8635 0.0 0.0 0.0
2012 8532 0.0 0.0 0.0
2013 8313 0.0 0.0 0.0
2014 8474 0.0 0.0 0.0
2015 7754 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 3608 0.0 0.0 0.0
2019 8447 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-08-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References