X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505061413000

Well Details

Well ID: 0505061413000
Loading map...
Location: 00/13-14-050-06W5/0
Location Alias: 00/13-14-50-06 W5M
Location Alias 2: 00/13-14-050-06 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 06
Section: 14
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ PEMBINA 13-14-50-6
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0421532
License Date: 2010-06-30
License Status: Issued
Spud Date: 2010-08-10
Final Drill Date: 2010-08-20
Well Total Depth: 2795.00 m
Surface Hole Latitude: 53.307869
Surface Hole Longitude: -114.778871

For data sources see[1][2]

Well History

Date Event
2010-06-30 Obtained License
2010-08-11 Surface Casing Operation Performed
2010-08-13 Direction Drilling Operation Performed - Horizontal
2010-08-13 Well Log Performed
2010-08-15 Intermediate Casing Operation Performed
2010-08-20 Finished Drilling
2010-08-20 Well Mode changed to Drilled and Cased
2010-08-23 Liner Casing Operation Performed
2010-08-24 Rig Released
2010-09-07 Well Log Performed
2010-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-08 Perforation Treatment Performed - Open-Hole Completion
2010-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-17 Well Began Production
2010-09-17 Well Fluid changed to Crude Oil
2010-09-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-13 903.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-08 Open Hole/Barefoot Completion 2745.00 2795.00 0
2010-09-08 Multi-Stage Fracture 2076.80 2076.90 0
2010-09-08 Multi-Stage Fracture 1999.70 1999.80 0
2010-09-09 Multi-Stage Fracture 1922.60 1922.70 0
2010-09-09 Multi-Stage Fracture 1855.60 1855.70 0
2010-09-09 Multi-Stage Fracture 1773.40 1773.50 0
2010-09-09 Multi-Stage Fracture 1696.40 1696.50 0
2010-09-09 Multi-Stage Fracture 1618.50 1618.60 0
2010-09-09 Multi-Stage Fracture 1549.60 1549.70 0
2010-09-09 Multi-Stage Fracture 1472.50 1472.60 0
2010-09-08 Multi-Stage Fracture 2682.90 2683.00 0
2010-09-08 Multi-Stage Fracture 2614.20 2614.30 0
2010-09-08 Multi-Stage Fracture 2533.40 2533.50 0
2010-09-08 Multi-Stage Fracture 2455.30 2455.40 0
2010-09-08 Multi-Stage Fracture 2377.90 2378.00 0
2010-09-08 Multi-Stage Fracture 2300.50 2300.60 0
2010-09-08 Multi-Stage Fracture 2235.10 2235.20 0
2010-09-08 Multi-Stage Fracture 2156.50 2156.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2422 0.0 0.0 0.0
2011 8632 0.0 0.0 0.0
2012 8568 0.0 0.0 0.0
2013 8469 0.0 0.0 0.0
2014 8474 0.0 0.0 0.0
2015 7754 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 4402 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-09-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References