If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505061409000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.327786,"lon":-114.771369,"icon":""}]} |
Location: 00/09-14-050-06W5/0 | |
Location Alias: 00/09-14-50-06 W5M | |
Location Alias 2: 00/09-14-050-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 06 | |
Section: 14 | |
County/Municipality: Parkland County | |
Well Name: DAYLIGHT PEMBINA 9-14-50-6 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0412186 | |
License Date: 2009-09-09 | |
License Status: Issued | |
Spud Date: 2009-09-22 | |
Final Drill Date: 2009-10-04 | |
Well Total Depth: 2420.00 m | |
Surface Hole Latitude: 53.327786 | |
Surface Hole Longitude: -114.771369 |
Date | Event |
---|---|
2009-09-09 | Obtained License |
2009-09-24 | Surface Casing Operation Performed |
2009-09-25 | Direction Drilling Operation Performed - Horizontal |
2009-09-29 | Well Log Performed |
2009-10-04 | Finished Drilling |
2009-10-04 | Well Mode changed to Drilled and Cased |
2009-10-05 | Well Log Performed |
2009-10-07 | Production Casing Operation Performed |
2009-10-07 | Rig Released |
2009-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2009-10-26 | Perforation Treatment Performed - Open-Hole Completion |
2009-12-04 | Well Began Production |
2009-12-04 | Well Fluid changed to Crude Oil |
2009-12-04 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-09-25 | 619.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-26 | Open Hole/Barefoot Completion | 2416.00 | 2420.00 | 0 |
2009-10-26 | Multi-Stage Fracture | 2237.00 | 2237.10 | 0 |
2009-10-26 | Multi-Stage Fracture | 2164.90 | 2165.00 | 0 |
2009-10-26 | Multi-Stage Fracture | 2072.50 | 2072.60 | 0 |
2009-10-26 | Multi-Stage Fracture | 1990.30 | 1990.40 | 0 |
2009-10-26 | Multi-Stage Fracture | 1907.60 | 1907.70 | 0 |
2009-10-26 | Multi-Stage Fracture | 1812.10 | 1812.20 | 0 |
2009-10-26 | Multi-Stage Fracture | 1729.30 | 1729.40 | 0 |
2009-10-26 | Multi-Stage Fracture | 1659.10 | 1659.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 608 | 0.0 | 0.0 | 0.0 |
2010 | 8393 | 0.0 | 0.0 | 0.0 |
2011 | 8557 | 0.0 | 0.0 | 0.0 |
2012 | 8560 | 0.0 | 0.0 | 0.0 |
2013 | 8559 | 0.0 | 0.0 | 0.0 |
2014 | 7148 | 0.0 | 0.0 | 0.0 |
2015 | 8615 | 0.0 | 0.0 | 0.0 |
2016 | 8451 | 0.0 | 0.0 | 0.0 |
2017 | 8747 | 0.0 | 0.0 | 0.0 |
2018 | 4415 | 0.0 | 0.0 | 0.0 |
2019 | 8303 | 0.0 | 0.0 | 0.0 |
2020 | 2099 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-10-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]