X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505060415000

Well Details

Well ID: 0505060415000
Loading map...
Location: 00/15-04-050-06W5/0
Location Alias: 00/15-04-50-06 W5M
Location Alias 2: 00/15-04-050-06 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 06
Section: 04
County/Municipality: Brazeau County
Well Name: SINOPEC HZ PEMBINA 15-4-50-6
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0464514
License Date: 2014-01-30
License Status: Issued
Spud Date: 2014-02-15
Final Drill Date: 2014-02-22
Well Total Depth: 2776.00 m
Surface Hole Latitude: 53.281742
Surface Hole Longitude: -114.813865

For data sources see[1][2]

Well History

Date Event
2014-01-30 Obtained License
2014-02-16 Surface Casing Operation Performed
2014-02-18 Direction Drilling Operation Performed - Deviate
2014-02-19 Direction Drilling Operation Performed - Horizontal
2014-02-20 Well Log Performed
2014-02-22 Finished Drilling
2014-02-22 Well Log Performed
2014-02-22 Well Mode changed to Drilled and Cased
2014-02-23 Well Log Performed
2014-02-25 Plug Back Performed
2014-02-25 Production Casing Operation Performed
2014-03-10 Rig Released
2014-03-10 Well Log Performed
2014-04-05 Perforation Treatment Performed - Multi-Stage Fracture
2014-04-06 Perforation Treatment Performed - Multi-Stage Fracture
2014-04-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-04-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-04-25 Well Began Production
2014-04-25 Well Fluid changed to Crude Oil
2014-04-25 Well Mode changed to Pumping
2014-08-31 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-02-15 Nabors Drilling Limited 32 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-18 1520.00 Deviate (5 - 79 degrees)
2014-02-19 1950.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-04-05 Multi-Stage Fracture 2633.40 2633.70 0
2014-04-06 Multi-Stage Fracture 2550.50 2551.50 0
2014-04-07 Multi-Stage Fracture 2467.50 2468.50 0
2014-04-07 Multi-Stage Fracture 2352.50 2353.50 0
2014-04-08 Multi-Stage Fracture 2260.50 2261.50 0
2014-08-31 Perforation 2224.00 2230.00 17
2014-08-31 Perforation 2167.00 2173.00 20
2014-08-31 Perforation 2095.00 2100.00 20
2014-08-31 Perforation 1967.50 1972.00 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-04-05 2014-04-08 1,808 193 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 26.9057 N/A
water Not Available 100 51.0107 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 21.0314 N/A
EnCap-LP Trican Breaker ammonium persulfate 7727-54-0 100 0.0219 N/A
cured acrylic resin Not Available 100 0.0219 N/A
silica crystalline 14808-60-7 100 0.0219 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1357 N/A
water Not Available 100 0.1357 N/A
WF-2 Trican Foamer 2-butoxyethanol 111-76-2 100 0.4972 N/A
non-hazardous ingredients Not Available 100 0.4972 N/A
poly(oxy-1.2-ethanediyl). a-hexyl-w-hydroxy 31726-34-8 100 0.4972 N/A
polyethylene glycol hexyl ether sulfate. ammonium salt 63428-86-4 100 0.4972 N/A
sulfonate. alkyl (C14-16)olefin. sodium salt 68439-57-6 100 0.4972 N/A
WG-7L Trican Gelling Agent carboxymethyl cellulose sodium salt 9004-32-4 100 0.397 N/A
naphtha (petroleum). hydrotreated heavy 64742-48-9 100 0.397 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-04-03 2014-04-06 Central Water Distribution Facility 38
2014-04-04 2014-04-04 Central Water Distribution Facility 276
2014-04-04 2014-04-06 Central Water Distribution Facility 62

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3633 0.0 0.0 0.0
2015 8179 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8692 0.0 0.0 0.0
2019 8385 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-10 No Incident Encountered 0.00 0.00
2014-04-16 No Incident Encountered 0.00 0.00
2014-09-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References