If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505050406020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.283896,"lon":-114.656924,"icon":""}]} |
Location: 02/06-04-050-05W5/0 | |
Location Alias: 02/06-04-50-05 W5M | |
Location Alias 2: 02/06-04-050-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 05 | |
Section: 04 | |
County/Municipality: Brazeau County | |
Well Name: WEST HZ PEMBINA 6-4-50-5 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0418520 | |
License Date: 2010-02-10 | |
License Status: Issued | |
Spud Date: 2010-02-26 | |
Final Drill Date: 2010-03-06 | |
Well Total Depth: 2511.00 m | |
Surface Hole Latitude: 53.283896 | |
Surface Hole Longitude: -114.656924 |
Date | Event |
---|---|
2010-02-10 | Obtained License |
2010-02-26 | Surface Casing Operation Performed |
2010-02-28 | Direction Drilling Operation Performed - Deviate |
2010-03-01 | Direction Drilling Operation Performed - Horizontal |
2010-03-02 | Intermediate Casing Operation Performed |
2010-03-06 | Finished Drilling |
2010-03-06 | Well Log Performed |
2010-03-06 | Well Mode changed to Drilled and Cased |
2010-03-07 | Liner Casing Operation Performed |
2010-03-08 | Rig Released |
2010-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-03-16 | Perforation Treatment Performed - Open-Hole Completion |
2010-04-01 | Well Began Production |
2010-04-01 | Well Fluid changed to Crude Oil |
2010-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-02-28 | 994.00 | Deviate (5 - 79 degrees) |
2010-03-01 | 1283.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-03-16 | Open Hole/Barefoot Completion | 2507.00 | 2511.00 | 0 |
2010-03-16 | Multi-Stage Fracture | 1604.20 | 1604.30 | 0 |
2010-03-16 | Multi-Stage Fracture | 1505.50 | 1505.60 | 0 |
2010-03-16 | Multi-Stage Fracture | 1395.20 | 1395.30 | 0 |
2010-03-16 | Multi-Stage Fracture | 2463.60 | 2463.70 | 0 |
2010-03-16 | Multi-Stage Fracture | 2349.80 | 2349.90 | 0 |
2010-03-16 | Multi-Stage Fracture | 2240.20 | 2240.30 | 0 |
2010-03-16 | Multi-Stage Fracture | 2141.50 | 2141.60 | 0 |
2010-03-16 | Multi-Stage Fracture | 2032.60 | 2032.70 | 0 |
2010-03-16 | Multi-Stage Fracture | 1922.30 | 1922.40 | 0 |
2010-03-16 | Multi-Stage Fracture | 1812.10 | 1812.20 | 0 |
2010-03-16 | Multi-Stage Fracture | 1713.40 | 1713.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 5866 | 0.0 | 0.0 | 0.0 |
2011 | 8569 | 0.0 | 0.0 | 0.0 |
2012 | 8727 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8699 | 0.0 | 0.0 | 0.0 |
2018 | 8183 | 0.0 | 0.0 | 0.0 |
2019 | 8231 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]