X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505042708000

Well Details

Well ID: 0505042708000
Loading map...
Location: 00/08-27-050-04W5/0
Location Alias: 00/08-27-50-04 W5M
Location Alias 2: 00/08-27-050-04 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 04
Section: 27
County/Municipality: Parkland County
Well Name: PCP HIGHVALE 8-27-50-4
Operator Name: Ovintiv Canada ULC
License Number: 0101045
License Date: 1983-03-22
License Status: Re-Entered
Spud Date: 1983-03-23
Final Drill Date: 1983-04-04
Well Total Depth: 1541.00 m
Surface Hole Latitude: 53.342464
Surface Hole Longitude: -114.493913

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-03-22 Obtained License
1983-04-04 Finished Drilling
1983-04-04 Well Mode changed to Drilled and Cased
1983-04-06 Drill Stem Test Performed
1983-04-07 Production Casing Operation Performed
1983-04-17 Drill Stem Test Performed
1983-04-17 Perforation Treatment Performed - Jet Perforation
1983-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-04-21 Perforation Treatment Performed - Jet Perforation
1983-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-05-14 Perforation Treatment Performed - Fractured
1983-05-16 Well Began Production
1983-05-16 Well Fluid changed to Crude Oil
1983-05-16 Well Mode changed to Pumping
1986-10-28 Well Fluid changed to Crude Oil
1986-10-28 Well Mode changed to Suspended
1987-10-28 Well Fluid changed to Crude Oil
1987-10-28 Well Mode changed to Abandoned and Re-entered
1987-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-12-04 Plug Back Performed
1987-12-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-04-17 Perforation 1511.60 1513.70 13
1983-04-19 Acid Treatment 1511.60 1513.70 0
1983-04-21 Packing Device Capped w/Cement 1509.00 1510.00 0
1983-04-21 Perforation 1502.00 1505.00 6
1983-05-13 Acid Treatment 1502.00 1505.00 0
1983-05-14 Fracture 1502.00 1505.00 0
1987-12-04 Packing Device Capped w/Cement 1487.00 1495.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4161 0.0 0.0 0.0
1984 7869 0.0 0.0 0.0
1985 7218 0.0 0.0 0.0
1986 2921 0.0 0.0 0.0

For data sources see[5]

References