X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504270108000

Well Details

Well ID: 0504270108000
Loading map...
Location: 00/08-01-050-27W4/0
Location Alias: 00/08-01-50-27 W4M
Location Alias 2: 00/08-01-050-27 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 27
Section: 01
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC 8-1-50-27
Operator Name: Imperial Oil Resources Limited
License Number: B0002745
License Date: 1949-04-04
License Status: RecCertified
Spud Date: 1949-05-04
Final Drill Date: 1949-06-05
Well Total Depth: 1583.70 m
Surface Hole Latitude: 53.285835
Surface Hole Longitude: -113.808620

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-04-04 Obtained License
1949-06-05 Finished Drilling
1949-06-05 Well Mode changed to Drilled and Cased
1949-06-06 Drill Stem Test Performed
1949-06-08 Perforation Treatment Performed - Open-Hole Completion
1949-06-08 Production Casing Operation Performed
1949-06-14 Perforation Treatment Performed - Jet Perforation
1949-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-06-28 Well Began Production
1949-06-28 Well Fluid changed to Crude Oil
1949-06-28 Well Mode changed to Flowing
1949-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-09 Well Fluid changed to Crude Oil
1961-02-09 Well Mode changed to Pumping
1979-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-01 Well Fluid changed to Crude Oil
1984-05-01 Well Mode changed to Suspended
1995-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-05-24 Perforation Treatment Performed - Jet Perforation
1995-05-24 Plug Back Performed
1995-05-24 Well Log Performed
1995-06-14 Perforation Treatment Performed - Remedial Casing
1995-06-14 Well Fluid changed to Crude Oil
1995-06-14 Well Mode changed to Abandoned
1995-06-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-06-08 Open Hole/Barefoot Completion 1567.00 1583.70 0
1995-05-24 Packing Device Capped w/Cement 1305.00 1313.00 0
1995-05-24 Perforation 160.00 161.00 13
1995-06-14 Remedial Casing Cementing 160.00 161.00 0
1949-06-14 Perforation 1581.30 1582.80 7
1949-06-16 Acid Treatment 1567.00 1583.70 0
1949-06-20 Acid Treatment 1567.00 1583.70 0
1949-06-24 Acid Treatment 1567.00 1583.70 0
1949-06-30 Acid Treatment 1567.00 1583.70 0
1958-06-23 Acid Treatment 1567.00 1583.70 0
1979-06-08 Acid Treatment 1567.00 1583.70 0
1995-05-24 Packing Device Capped w/Cement 1547.00 1555.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4582 0.0 0.0 0.0
1968 6856 0.0 0.0 0.0
1969 6647 0.0 0.0 0.0
1970 3767 0.0 0.0 0.0
1971 2856 0.0 0.0 0.0
1972 5784 0.0 0.0 0.0
1973 4560 0.0 0.0 0.0
1974 2608 0.0 0.0 0.0
1975 744 0.0 0.0 0.0
1976 5560 0.0 0.0 0.0
1977 4288 0.0 0.0 0.0
1978 3792 0.0 0.0 0.0
1979 4260 0.0 0.0 0.0
1980 7860 0.0 0.0 0.0
1981 7800 0.0 0.0 0.0
1982 7307 0.0 0.0 0.0

For data sources see[5]

References