X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263616000

Well Details

Well ID: 0504263616000
Loading map...
Location: 00/16-36-050-26W4/0
Location Alias: 00/16-36-50-26 W4M
Location Alias 2: 00/16-36-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 36
County/Municipality: Edmonton
Well Name: MEC LEDUC-WB 16-36-50-26
Operator Name: NEP Canada ULC
License Number: 0004135
License Date: 1952-01-25
License Status: RecCertified
Spud Date: 1952-01-28
Final Drill Date: 1952-03-01
Well Total Depth: 1619.40 m
Surface Hole Latitude: 53.364982
Surface Hole Longitude: -113.662518

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-01-25 Obtained License
1952-02-14 Drill Stem Test Performed
1952-02-21 Drill Stem Test Performed
1952-02-26 Liner Casing Operation Performed
1952-03-01 Finished Drilling
1952-03-01 Well Mode changed to Drilled and Cased
1952-03-06 Perforation Treatment Performed - Acid Wash - No Pressure
1952-03-06 Perforation Treatment Performed - Jet Perforation
1952-03-07 Perforation Treatment Performed - Jet Perforation
1952-03-08 Perforation Treatment Performed - Acid Wash - No Pressure
1952-07-07 Well Began Production
1952-07-07 Well Fluid changed to Crude Oil
1952-07-07 Well Mode changed to Flowing
1982-07-05 Perforation Treatment Performed - Cement Squeeze
1982-07-10 Perforation Treatment Performed - Jet Perforation
1982-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-11 Well Fluid changed to Crude Oil
1982-07-11 Well Mode changed to Pumping
1987-03-02 Perforation Treatment Performed - Jet Perforation
1987-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-01 Well Fluid changed to Crude Oil
1988-03-01 Well Mode changed to Suspended
1993-03-24 Well Log Performed
1993-04-21 Well Log Performed
1993-04-22 Well Log Performed
1993-08-15 Well Log Performed
1993-08-16 Perforation Treatment Performed - Jet Perforation
1993-08-20 Well Log Performed
1993-09-01 Well Log Performed
1993-09-18 Well Log Performed
1993-09-21 Perforation Treatment Performed - Jet Perforation
1993-09-21 Well Log Performed
1993-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-02 Well Fluid changed to Gas
1993-11-02 Well Mode changed to Flowing
1994-02-08 Perforation Treatment Performed - Jet Perforation
1994-02-08 Well Log Performed
1994-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-09 Perforation Treatment Performed - Jet Perforation
1994-09-20 Well Fluid changed to Gas
1994-09-20 Well Mode changed to Suspended
1999-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-13 Plug Back Performed
1999-07-13 Well Fluid changed to Gas
1999-07-13 Well Mode changed to Abandoned Zone
1999-07-14 Perforation Treatment Performed - Jet Perforation
1999-07-14 Well Log Performed
1999-10-12 Perforation Treatment Performed - Jet Perforation
1999-11-18 Perforation Treatment Performed - Jet Perforation
1999-11-19 Perforation Treatment Performed - Fractured
2002-03-06 Perforation Treatment Performed - Cement Squeeze
2002-03-06 Plug Back Performed
2002-03-15 Perforation Treatment Performed - Jet Perforation
2002-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-20 Perforation Treatment Performed - Jet Perforation
2002-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-25 Plug Back Performed
2002-07-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-06 Perforation 1615.70 1617.30 13
1993-08-16 Perforation 1555.50 1558.50 14
1993-09-21 Perforation 1559.00 1561.50 13
1993-09-22 Acid Treatment 1559.00 1561.50 0
1994-02-08 Perforation 1563.00 1567.50 13
1994-02-09 Perforation 1572.50 1575.00 13
1994-02-09 Acid Treatment 1563.00 1575.00 0
1999-07-13 Packing Device Capped w/Cement 1540.00 1548.00 0
1999-07-14 Perforation 1273.50 1277.50 18
1999-10-12 Perforation 1277.50 1279.50 18
1999-11-18 Perforation 1139.00 1144.00 14
1952-03-06 Acid Wash 1615.70 1617.30 0
1999-11-19 Fracture 1139.00 1144.00 0
2002-03-06 Cement Squeeze 1273.50 1279.50 0
2002-03-06 Cement Squeeze 1139.00 1144.00 0
2002-03-15 Perforation 1455.00 1459.00 17
2002-03-15 Perforation 1466.00 1467.00 17
2002-03-15 Perforation 1468.50 1472.50 17
2002-03-19 Acid Treatment 1455.00 1459.00 0
2002-03-19 Acid Treatment 1466.00 1467.00 0
2002-03-19 Acid Treatment 1468.50 1472.50 0
2002-03-20 Perforation 1492.00 1494.00 17
1952-03-07 Perforation 1615.70 1617.30 13
2002-03-21 Acid Treatment 1492.00 1494.00 0
2002-03-25 Packing Device Capped w/Cement 1259.00 1267.00 0
2002-03-25 Packing Device Capped w/Cement 1125.50 1133.50 0
2002-03-25 Packing Device Capped w/Cement 1440.00 1448.00 0
1952-03-08 Acid Wash 1615.70 1617.30 0
1982-07-05 Cement Squeeze 1615.70 1617.30 0
1982-07-10 Perforation 1615.50 1615.70 10
1982-07-11 Acid Treatment 1615.50 1615.70 0
1987-03-02 Perforation 1615.30 1615.50 3
1987-03-03 Acid Treatment 1615.30 1615.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1967 116 0.0 0.0 0.0
1982 1860 0.0 0.0 0.0
1983 4860 0.0 0.0 0.0
1984 6192 0.0 0.0 0.0
1985 7578 0.0 0.0 0.0
1986 4552 0.0 0.0 0.0
1987 8002 0.0 0.0 0.0
1988 576 0.0 0.0 0.0
1993 885 0.0 0.0 0.0
1994 1939 0.0 0.0 0.0

For data sources see[5]

References