X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263604000

Well Details

Well ID: 0504263604000
Loading map...
Location: 00/04-36-050-26W4/0
Location Alias: 00/04-36-50-26 W4M
Location Alias 2: 00/04-36-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 36
County/Municipality: Edmonton
Well Name: MEC LEDUC-WB 4-36-50-26
Operator Name: NEP Canada ULC
License Number: B0002008
License Date: 1948-01-24
License Status: RecCertified
Spud Date: 1948-02-06
Final Drill Date: 1948-04-04
Well Total Depth: 1625.00 m
Surface Hole Latitude: 53.353236
Surface Hole Longitude: -113.681949

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-01-24 Obtained License
1948-04-02 Production Casing Operation Performed
1948-04-04 Finished Drilling
1948-04-04 Perforation Treatment Performed - Open-Hole Completion
1948-04-04 Well Mode changed to Drilled and Cased
1948-04-06 Well Began Production
1948-04-06 Well Fluid changed to Crude Oil
1948-04-06 Well Mode changed to Flowing
1986-09-07 Well Fluid changed to Crude Oil
1986-09-07 Well Mode changed to Suspended
1989-07-25 Well Log Performed
1989-07-27 Perforation Treatment Performed - Open-Hole Completion
1989-08-10 Well Log Performed
1989-08-11 Well Log Performed
1991-02-23 Well Log Performed
1991-08-13 Well Log Performed
1992-01-15 Well Log Performed
2000-02-11 Perforation Treatment Performed - Jet Perforation
2000-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-14 Perforation Treatment Performed - Cement Plug
2000-02-14 Plug Back Performed
2000-02-15 Perforation Treatment Performed - Cement Squeeze
2000-02-24 Well Abandoned
2000-02-24 Well Fluid changed to Crude Oil
2000-02-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-04-04 Open Hole/Barefoot Completion 1612.10 1616.70 0
1989-07-27 Open Hole/Barefoot Completion 1612.10 1625.00 0
2000-02-11 Perforation 1503.00 1509.00 17
2000-02-11 Perforation 1492.00 1498.00 17
2000-02-11 Perforation 1484.00 1488.00 17
2000-02-12 Acid Treatment 1484.00 1509.00 0
2000-02-14 Cement Plug 1467.00 1475.00 0
2000-02-15 Cement Squeeze 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7719 0.0 0.0 0.0
1968 5550 0.0 0.0 0.0
1972 1992 0.0 0.0 0.0
1973 8052 0.0 0.0 0.0
1974 4124 0.0 0.0 0.0
1975 4834 0.0 0.0 0.0
1976 8527 0.0 0.0 0.0
1977 8360 0.0 0.0 0.0
1978 8416 0.0 0.0 0.0
1979 8468 0.0 0.0 0.0
1980 8111 0.0 0.0 0.0
1981 8159 0.0 0.0 0.0
1982 8475 0.0 0.0 0.0
1983 8026 0.0 0.0 0.0
1984 8059 0.0 0.0 0.0
1985 5110 0.0 0.0 0.0
1986 260 0.0 0.0 0.0
1987 216 0.0 0.0 0.0

For data sources see[5]

References