X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263003020

Well Details

Well ID: 0504263003020
Loading map...
Location: 02/03-30-050-26W4/0
Location Alias: 02/03-30-50-26 W4M
Location Alias 2: 02/03-30-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 30
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO. 586
Operator Name: Imperial Oil Resources Limited
License Number: 0006766
License Date: 1953-07-17
License Status: RecExempt
Spud Date: 1953-08-25
Final Drill Date: 1953-09-11
Well Total Depth: 1554.50 m
Surface Hole Latitude: 53.339803
Surface Hole Longitude: -113.796798

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-17 Obtained License
1953-09-11 Finished Drilling
1953-09-11 Production Casing Operation Performed
1953-09-11 Well Mode changed to Drilled and Cased
1953-09-21 Perforation Treatment Performed - Open-Hole Completion
1953-09-25 Well Began Production
1953-09-25 Well Fluid changed to Crude Oil
1953-09-25 Well Mode changed to Flowing
1961-07-06 Well Fluid changed to Crude Oil
1961-07-06 Well Mode changed to Pumping
1996-04-01 Well Fluid changed to Crude Oil
1996-04-01 Well Mode changed to Suspended
1998-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-18 Perforation Treatment Performed - Jet Perforation
1998-08-18 Plug Back Performed
1998-08-18 Well Log Performed
1998-09-23 Perforation Treatment Performed - Remedial Casing
1998-10-02 Well Abandoned
1998-10-02 Well Fluid changed to Crude Oil
1998-10-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-09-21 Open Hole/Barefoot Completion 1533.10 1554.50 0
1998-08-18 Packing Device Capped w/Cement 1517.00 1525.00 0
1998-08-18 Packing Device Capped w/Cement 1262.00 1270.00 0
1998-08-18 Perforation 160.00 161.00 13
1998-09-23 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8340 0.0 0.0 0.0
1968 8729 0.0 0.0 0.0
1969 8735 0.0 0.0 0.0
1970 8651 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8616 0.0 0.0 0.0
1973 8035 0.0 0.0 0.0
1974 8336 0.0 0.0 0.0
1975 7483 0.0 0.0 0.0
1976 8479 0.0 0.0 0.0
1977 8348 0.0 0.0 0.0
1978 8553 0.0 0.0 0.0
1979 8619 0.0 0.0 0.0
1980 3816 0.0 0.0 0.0
1981 5224 0.0 0.0 0.0
1982 8331 0.0 0.0 0.0
1983 7857 0.0 0.0 0.0
1984 8590 0.0 0.0 0.0
1985 5973 0.0 0.0 0.0
1986 8000 0.0 0.0 0.0
1987 8272 0.0 0.0 0.0
1988 8339 0.0 0.0 0.0
1989 5232 0.0 0.0 0.0
1990 8537 0.0 0.0 0.0
1991 8151 0.0 0.0 0.0
1992 7912 0.0 0.0 0.0
1993 7939 0.0 0.0 0.0
1994 8436 0.0 0.0 0.0
1995 8750 0.0 0.0 0.0
1996 1749 0.0 0.0 0.0

For data sources see[5]

References