X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262606000

Well Details

Well ID: 0504262606000
Loading map...
Location: 00/06-26-050-26W4/0
Location Alias: 00/06-26-50-26 W4M
Location Alias 2: 00/06-26-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 26
County/Municipality: Devon
Well Name: IMPERIAL HUDSON'S BAY LEDUC NO.71
Operator Name: Imperial Oil Resources Limited
License Number: B0002114
License Date: 1948-05-20
License Status: Abandoned
Spud Date: 1948-07-03
Final Drill Date: 1948-08-17
Well Total Depth: 1631.00 m
Surface Hole Latitude: 53.343309
Surface Hole Longitude: -113.698808

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-05-20 Obtained License
1948-08-11 Drill Stem Test Performed
1948-08-17 Finished Drilling
1948-08-17 Well Mode changed to Drilled and Cased
1948-08-21 Production Casing Operation Performed
1948-08-24 Perforation Treatment Performed - Bullet Perforation
1948-08-25 Well Began Production
1948-08-25 Well Fluid changed to Crude Oil
1948-08-25 Well Mode changed to Flowing
1956-08-06 Perforation Treatment Performed - Cement Squeeze
1956-08-09 Perforation Treatment Performed - Jet Perforation
1956-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-05-17 Perforation Treatment Performed - Cement Squeeze
1973-05-22 Perforation Treatment Performed - Jet Perforation
1973-06-05 Well Fluid changed to Crude Oil
1973-06-05 Well Mode changed to Pumping
1981-03-03 Perforation Treatment Performed - Cement Squeeze
1981-03-07 Perforation Treatment Performed - Selective Jet Perforations
1981-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-17 Perforation Treatment Performed - Cement Squeeze
1985-04-19 Perforation Treatment Performed - Jet Perforation
1985-04-19 Well Log Performed
1985-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-29 Perforation Treatment Performed - Cement Squeeze
1985-04-30 Perforation Treatment Performed - Jet Perforation
1985-04-30 Well Log Performed
1985-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-13 Well Fluid changed to Crude Oil
1989-03-13 Well Mode changed to Suspended
1989-07-17 Perforation Treatment Performed - Cement Squeeze
1989-07-17 Well Log Performed
1989-07-19 Well Log Performed
1989-07-20 Perforation Treatment Performed - Open-Hole Completion
1989-08-09 Well Log Performed
1991-02-22 Well Log Performed
1991-07-10 Well Log Performed
1992-02-11 Well Log Performed
1992-08-09 Well Log Performed
1993-08-14 Well Log Performed
1996-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-16 Plug Back Performed
1996-05-16 Well Log Performed
1996-05-22 Well Abandoned
1996-05-22 Well Fluid changed to Crude Oil
1996-05-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-08-24 Bullet Perforation 1619.40 1620.90 23
1985-04-17 Cement Squeeze 1619.50 1619.60 0
1985-04-19 Perforation 1618.60 1618.80 13
1985-04-20 Acid Treatment 1618.60 1618.80 0
1985-04-29 Acid Treatment 1618.60 1618.80 0
1985-04-29 Cement Squeeze 1618.60 1618.80 0
1985-04-30 Perforation 1618.20 1618.30 13
1985-05-01 Acid Treatment 1618.20 1618.30 0
1989-07-17 Cement Squeeze 1618.20 1618.30 0
1989-07-20 Open Hole/Barefoot Completion 1623.10 1631.00 0
1996-05-16 Packing Device Capped w/Cement 1596.50 1604.50 0
1956-08-06 Cement Squeeze 1619.40 1620.90 0
1996-05-16 Packing Device Capped w/Cement 1212.00 1220.00 0
1956-08-09 Perforation 1618.20 1619.70 13
1956-08-11 Acid Treatment 1618.20 1619.70 0
1973-05-17 Cement Squeeze 1618.20 1619.70 0
1973-05-22 Perforation 1619.40 1620.30 7
1981-03-03 Cement Squeeze 1619.40 1620.30 0
1981-03-07 Selective Jet Perforations 1619.50 1619.60 0
1981-03-09 Acid Treatment 1619.50 1619.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1968 912 0.0 0.0 0.0
1972 3788 0.0 0.0 0.0
1973 4416 0.0 0.0 0.0
1974 8451 0.0 0.0 0.0
1975 7701 0.0 0.0 0.0
1976 8535 0.0 0.0 0.0
1977 7975 0.0 0.0 0.0
1978 7060 0.0 0.0 0.0
1979 8502 0.0 0.0 0.0
1980 8158 0.0 0.0 0.0
1981 7887 0.0 0.0 0.0
1982 8623 0.0 0.0 0.0
1983 7980 0.0 0.0 0.0
1984 8551 0.0 0.0 0.0
1985 6038 0.0 0.0 0.0
1986 6752 0.0 0.0 0.0
1987 7643 0.0 0.0 0.0
1988 8310 0.0 0.0 0.0
1989 672 0.0 0.0 0.0

For data sources see[5]

References