X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504261816020

Well Details

Well ID: 0504261816020
Loading map...
Location: 02/16-18-050-26W4/0
Location Alias: 02/16-18-50-26 W4M
Location Alias 2: 02/16-18-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 18
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO. 260 WELL,
Operator Name: Imperial Oil Limited
License Number: 0001171
License Date: 1950-02-08
License Status: RecCertified
Spud Date: 1950-03-16
Final Drill Date: 1950-04-04
Well Total Depth: 1585.00 m
Surface Hole Latitude: 53.321613
Surface Hole Longitude: -113.784427

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-02-08 Obtained License
1950-04-04 Finished Drilling
1950-04-04 Well Mode changed to Drilled and Cased
1950-04-05 Production Casing Operation Performed
1950-04-07 Perforation Treatment Performed - Open-Hole Completion
1950-04-08 Well Began Production
1950-04-08 Well Fluid changed to Crude Oil
1950-04-08 Well Mode changed to Flowing
1958-10-09 Well Fluid changed to Crude Oil
1958-10-09 Well Mode changed to Pumping
1962-07-05 Perforation Treatment Performed - Cement Plug
1962-07-05 Perforation Treatment Performed - Open-Hole Completion
1964-01-31 Perforation Treatment Performed - Cement Squeeze
1964-02-01 Perforation Treatment Performed - Open-Hole Completion
1964-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-03 Perforation Treatment Performed - Jet Perforation
1964-04-16 Perforation Treatment Performed - Cement Plug
1964-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-08 Perforation Treatment Performed - Cement Plug
1969-09-15 Well Abandoned
1969-09-15 Well Fluid changed to Crude Oil
1969-09-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-04-07 Open Hole/Barefoot Completion 1554.50 1585.00 0
1969-09-08 Cement Plug 1522.20 1554.20 0
1962-07-05 Cement Plug 1568.80 1585.00 0
1962-07-05 Open Hole/Barefoot Completion 1554.50 1568.80 0
1964-01-31 Cement Squeeze 1556.30 1568.80 0
1964-02-01 Open Hole/Barefoot Completion 1554.50 1556.30 0
1964-02-03 Perforation 1549.00 1554.80 0
1964-02-03 Acid Treatment 1549.00 1554.80 0
1964-04-16 Cement Plug 1554.20 1556.30 0
1964-04-18 Acid Treatment 1549.00 1554.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

References