X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504261708020

Well Details

Well ID: 0504261708020
Loading map...
Location: 02/08-17-050-26W4/0
Location Alias: 02/08-17-50-26 W4M
Location Alias 2: 02/08-17-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 17
County/Municipality: Leduc County
Well Name: PONDER-MODEL-LEDUC NO.8
Operator Name: Murphy Oil Company Ltd.
License Number: 0004281
License Date: 1952-02-29
License Status: Abandoned
Spud Date: 1952-03-08
Final Drill Date: 1952-04-02
Well Total Depth: 1605.20 m
Surface Hole Latitude: 53.314388
Surface Hole Longitude: -113.760316

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-29 Obtained License
1952-04-01 Drill Stem Test Performed
1952-04-02 Drill Stem Test Performed
1952-04-02 Finished Drilling
1952-04-02 Well Mode changed to Drilled and Cased
1952-04-04 Perforation Treatment Performed - Open-Hole Completion
1952-04-04 Production Casing Operation Performed
1952-04-07 Perforation Treatment Performed - Acid Wash - No Pressure
1952-04-08 Well Began Production
1952-04-08 Well Fluid changed to Crude Oil
1952-04-08 Well Mode changed to Flowing
1961-03-03 Well Fluid changed to Crude Oil
1961-03-03 Well Mode changed to Pumping
1966-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-10-01 Perforation Treatment Performed - Open-Hole Completion
1982-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-26 Well Log Performed
1986-02-06 Liner Casing Operation Performed
1986-02-06 Perforation Treatment Performed - Cement Squeeze
1986-02-10 Perforation Treatment Performed - Jet Perforation
1986-02-10 Well Log Performed
1986-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-01 Well Fluid changed to Crude Oil
1986-10-01 Well Mode changed to Suspended
1987-06-13 Perforation Treatment Performed - Jet Perforation
1987-06-14 Well Log Performed
1987-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-06 Well Fluid changed to Crude Oil
1987-07-06 Well Mode changed to Pumping
1988-06-01 Well Fluid changed to Crude Oil
1988-06-01 Well Mode changed to Suspended
1992-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-28 Plug Back Performed
1992-02-28 Well Fluid changed to Crude Oil
1992-02-28 Well Mode changed to Abandoned Zone
1996-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-23 Perforation Treatment Performed - Jet Perforation
1996-07-23 Plug Back Performed
1996-07-24 Well Log Performed
1996-08-08 Perforation Treatment Performed - Remedial Casing
1997-06-18 Well Abandoned
1997-06-18 Well Fluid changed to Crude Oil
1997-06-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-04 Open Hole/Barefoot Completion 1557.50 1568.80 0
1986-02-11 Acid Treatment 1567.50 1578.20 0
1986-02-12 Acid Treatment 1567.50 1570.80 0
1987-06-13 Perforation 1564.00 1567.50 7
1987-06-13 Perforation 1570.80 1577.00 7
1987-06-15 Acid Treatment 1564.00 1578.20 0
1992-02-28 Packing Device Capped w/Cement 1543.80 1554.00 0
1992-02-28 Packing Device Capped w/Cement 1497.00 1505.00 0
1996-07-23 Packing Device Capped w/Cement 1257.00 1265.00 0
1996-07-23 Perforation 160.00 161.00 13
1996-08-08 Remedial Casing Cementing 160.00 161.00 0
1952-04-07 Acid Wash 1557.50 1568.80 0
1966-09-27 Acid Treatment 1557.50 1568.80 0
1978-10-25 Acid Treatment 1557.50 1568.80 0
1982-10-01 Open Hole/Barefoot Completion 1557.50 1605.20 0
1982-10-04 Acid Treatment 1557.50 1575.00 0
1986-02-06 Cement Squeeze 1557.50 1605.20 0
1986-02-10 Perforation 1567.50 1570.80 7
1986-02-10 Perforation 1577.00 1578.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8623 0.0 0.0 0.0
1968 8511 0.0 0.0 0.0
1969 8519 0.0 0.0 0.0
1970 8459 0.0 0.0 0.0
1971 8231 0.0 0.0 0.0
1972 8556 0.0 0.0 0.0
1973 8579 0.0 0.0 0.0
1974 7480 0.0 0.0 0.0
1975 7133 0.0 0.0 0.0
1976 566 0.0 0.0 0.0
1977 1776 0.0 0.0 0.0
1978 7127 0.0 0.0 0.0
1979 8428 0.0 0.0 0.0
1980 8231 0.0 0.0 0.0
1981 8499 0.0 0.0 0.0
1982 6443 0.0 0.0 0.0
1983 6322 0.0 0.0 0.0
1984 8474 0.0 0.0 0.0
1985 7190 0.0 0.0 0.0
1987 2815 0.0 0.0 0.0
1988 2512 0.0 0.0 0.0

For data sources see[5]

References