X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504261502000

Well Details

Well ID: 0504261502000
Loading map...
Location: 00/02-15-050-26W4/0
Location Alias: 00/02-15-50-26 W4M
Location Alias 2: 00/02-15-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 15
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO. 512
Operator Name: Imperial Oil Resources Limited
License Number: 0005398
License Date: 1952-09-30
License Status: RecCertified
Spud Date: 1952-10-17
Final Drill Date: 1952-11-12
Well Total Depth: 1642.00 m
Surface Hole Latitude: 53.310575
Surface Hole Longitude: -113.717246

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-30 Obtained License
1952-10-27 Drill Stem Test Performed
1952-11-01 Drill Stem Test Performed
1952-11-02 Drill Stem Test Performed
1952-11-04 Drill Stem Test Performed
1952-11-08 Production Casing Operation Performed
1952-11-12 Finished Drilling
1952-11-12 Perforation Treatment Performed - Open-Hole Completion
1952-11-12 Well Mode changed to Drilled and Cased
1952-11-19 Perforation Treatment Performed - Acid Wash - No Pressure
1953-01-30 Well Began Production
1953-01-30 Well Fluid changed to Crude Oil
1953-01-30 Well Mode changed to Pumping
1983-04-08 Well Fluid changed to Crude Oil
1983-04-08 Well Mode changed to Suspended
1993-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-20 Plug Back Performed
1993-02-20 Well Log Performed
1993-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-25 Well Fluid changed to Crude Oil
1993-02-25 Well Mode changed to Abandoned
1993-06-11 Well Log Performed
1993-07-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-11-12 Open Hole/Barefoot Completion 1636.80 1642.00 0
1952-11-19 Acid Wash 1636.80 1642.00 0
1993-02-20 Packing Device Capped w/Cement 1610.00 1626.00 0
1993-02-20 Packing Device Capped w/Cement 1283.00 1291.00 0
1993-02-25 Packing Device Capped w/Cement 1117.00 1125.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1968 96 0.0 0.0 0.0

For data sources see[5]

References