X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260910020

Well Details

Well ID: 0504260910020
Loading map...
Location: 02/10-09-050-26W4/0
Location Alias: 02/10-09-50-26 W4M
Location Alias 2: 02/10-09-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 09
County/Municipality: Leduc County
Well Name: FLIER'S NO. 2 WELL
Operator Name: Fliers Oil Limited
License Number: 0002005
License Date: 1950-09-09
License Status: RecExempt
Spud Date: 1950-10-03
Final Drill Date: 1950-10-28
Well Total Depth: 1597.20 m
Surface Hole Latitude: 53.303411
Surface Hole Longitude: -113.742065

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-09-09 Obtained License
1950-10-23 Production Casing Operation Performed
1950-10-28 Finished Drilling
1950-10-28 Perforation Treatment Performed - Open-Hole Completion
1950-10-28 Well Mode changed to Drilled and Cased
1950-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-11-02 Perforation Treatment Performed - Acid Wash - No Pressure
1950-11-03 Perforation Treatment Performed - Acid Wash - No Pressure
1950-11-06 Perforation Treatment Performed - Acid Wash - No Pressure
1950-12-08 Perforation Treatment Performed - Bullet Perforation
1950-12-08 Perforation Treatment Performed - Jet Perforation
1951-01-06 Well Began Production
1951-01-06 Well Fluid changed to Crude Oil
1951-01-06 Well Mode changed to Pumping
1957-01-17 Perforation Treatment Performed - Cement Plug
1957-02-03 Well Abandoned
1957-02-03 Well Fluid changed to Crude Oil
1957-02-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-10-28 Open Hole/Barefoot Completion 1560.60 1597.20 0
1950-12-08 Bullet Perforation 1582.20 1584.40 13
1950-12-08 Bullet Perforation 1584.40 1585.60 13
1957-01-17 Cement Plug 1536.20 1597.20 0
1950-10-30 Acid Treatment 1560.60 1597.20 0
1950-10-31 Acid Treatment 1560.60 1597.20 0
1950-11-02 Acid Wash 1560.60 1597.20 0
1950-11-03 Acid Wash 1560.60 1597.20 0
1950-11-06 Acid Wash 1560.60 1597.20 0
1950-12-08 Perforation 1565.10 1567.30 13
1950-12-08 Perforation 1570.30 1572.20 13
1950-12-08 Bullet Perforation 1575.20 1575.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References