X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260908000

Well Details

Well ID: 0504260908000
Loading map...
Location: 00/08-09-050-26W4/0
Location Alias: 00/08-09-50-26 W4M
Location Alias 2: 00/08-09-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 09
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 8-9-50-26
Operator Name: NEP Canada ULC
License Number: B0001724
License Date: 1947-06-23
License Status: Suspension
Spud Date: 1947-06-28
Final Drill Date: 1947-11-12
Well Total Depth: 1649.60 m
Surface Hole Latitude: 53.299528
Surface Hole Longitude: -113.735556

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1947-06-23 Obtained License
1947-11-02 Drill Stem Test Performed
1947-11-03 Drill Stem Test Performed
1947-11-05 Drill Stem Test Performed
1947-11-06 Drill Stem Test Performed
1947-11-07 Drill Stem Test Performed
1947-11-12 Finished Drilling
1947-11-12 Well Mode changed to Drilled and Cased
1947-11-16 Perforation Treatment Performed - Open-Hole Completion
1947-11-16 Production Casing Operation Performed
1947-11-26 Well Began Production
1947-11-26 Well Fluid changed to Crude Oil
1947-11-26 Well Mode changed to Flowing
1973-07-20 Well Fluid changed to Crude Oil
1973-07-20 Well Mode changed to Pumping
1980-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-08 Perforation Treatment Performed - Cement Squeeze
1980-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-10 Perforation Treatment Performed - Selective Jet Perforations
1987-04-21 Perforation Treatment Performed - Jet Perforation
1987-04-21 Well Log Performed
1987-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-29 Well Fluid changed to Crude Oil
1990-06-29 Well Mode changed to Suspended
1998-02-01 Well Fluid changed to Crude Oil
1998-02-01 Well Mode changed to Suspended
1998-03-18 Perforation Treatment Performed - Jet Perforation
1998-03-22 Perforation Treatment Performed - Fractured
2001-11-21 Perforation Treatment Performed - Cement Squeeze
2001-11-21 Plug Back Performed
2001-11-28 Perforation Treatment Performed - Jet Perforation
2001-12-03 Perforation Treatment Performed - Jet Perforation
2001-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-13 Well Fluid changed to Crude Oil
2001-12-13 Well Mode changed to Pumping
2002-12-31 Well Fluid changed to Crude Oil
2002-12-31 Well Mode changed to Suspended
2003-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-24 Plug Back Performed
2003-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-28 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1947-11-16 Open Hole/Barefoot Completion 1647.40 1649.60 0
2001-11-21 Cement Squeeze 1323.00 1327.00 0
2001-11-28 Perforation 1647.00 1648.50 18
2001-12-03 Perforation 1647.80 1649.30 18
2001-12-06 Acid Treatment 1647.00 1648.50 0
2001-12-06 Acid Treatment 1647.80 1649.30 0
2003-01-24 Packing Device Capped w/Cement 1632.00 1640.00 0
2003-01-28 Packing Device Capped w/Cement 1307.00 1315.00 0
1980-04-07 Acid Treatment 1647.40 1649.60 0
1980-04-08 Cement Squeeze 1647.40 1649.60 0
1980-04-10 Selective Jet Perforations 1648.30 1648.40 0
1980-04-10 Acid Treatment 1648.30 1648.40 0
1987-04-21 Perforation 1648.00 1648.30 13
1987-04-22 Acid Treatment 1648.00 1648.30 0
1998-03-18 Perforation 1323.00 1327.00 13
1998-03-22 Fracture 1323.00 1327.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 168 0.0 0.0 0.0
1971 48 0.0 0.0 0.0
1972 2496 0.0 0.0 0.0
1973 3852 0.0 0.0 0.0
1974 8531 0.0 0.0 0.0
1975 8332 0.0 0.0 0.0
1976 8474 0.0 0.0 0.0
1977 8448 0.0 0.0 0.0
1978 8459 0.0 0.0 0.0
1979 7176 0.0 0.0 0.0
1980 6936 0.0 0.0 0.0
1981 8631 0.0 0.0 0.0
1982 8058 0.0 0.0 0.0
1983 7148 0.0 0.0 0.0
1984 8576 0.0 0.0 0.0
1985 7383 0.0 0.0 0.0
1986 8348 0.0 0.0 0.0
1987 7195 0.0 0.0 0.0
1988 8458 0.0 0.0 0.0
1989 7637 0.0 0.0 0.0
1990 4055 0.0 0.0 0.0
2001 276 0.0 0.0 0.0
2002 5900 0.0 0.0 0.0

For data sources see[5]

References