X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260611000

Well Details

Well ID: 0504260611000
Loading map...
Location: 00/11-06-050-26W4/0
Location Alias: 00/11-06-50-26 W4M
Location Alias 2: 00/11-06-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 06
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC #280
Operator Name: Imperial Oil Limited
License Number: 0001829
License Date: 1950-08-03
License Status: RecCertified
Spud Date: 1950-09-05
Final Drill Date: 1950-10-13
Well Total Depth: 1646.80 m
Surface Hole Latitude: 53.288708
Surface Hole Longitude: -113.796239

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-08-03 Obtained License
1950-09-29 Drill Stem Test Performed
1950-09-30 Drill Stem Test Performed
1950-10-01 Drill Stem Test Performed
1950-10-02 Drill Stem Test Performed
1950-10-06 Liner Casing Operation Performed
1950-10-10 Drill Stem Test Performed
1950-10-11 Drill Stem Test Performed
1950-10-12 Drill Stem Test Performed
1950-10-13 Drill Stem Test Performed
1950-10-13 Finished Drilling
1950-10-13 Well Mode changed to Drilled and Cased
1950-10-14 Drill Stem Test Performed
1950-10-18 Perforation Treatment Performed - Acid Wash - No Pressure
1950-10-18 Perforation Treatment Performed - Jet Perforation
1950-10-19 Perforation Treatment Performed - Acid Wash - No Pressure
1950-10-19 Perforation Treatment Performed - Jet Perforation
1950-10-22 Perforation Treatment Performed - Acid Wash - No Pressure
1950-10-22 Perforation Treatment Performed - Jet Perforation
1950-10-24 Perforation Treatment Performed - Acid Wash - No Pressure
1950-10-27 Perforation Treatment Performed - Cement Plug
1950-10-28 Perforation Treatment Performed - Jet Perforation
1950-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1950-12-16 Well Began Production
1950-12-16 Well Fluid changed to Crude Oil
1950-12-16 Well Mode changed to Flowing
1959-12-03 Perforation Treatment Performed - Cement Plug
1959-12-04 Well Fluid changed to Crude Oil
1959-12-04 Well Mode changed to Pumping
1970-07-28 Perforation Treatment Performed - Jet Perforation
1970-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-31 Perforation Treatment Performed - Acid Wash - No Pressure
1972-07-18 Perforation Treatment Performed - Cement Squeeze
1972-07-26 Well Abandoned
1972-07-26 Well Fluid changed to Crude Oil
1972-07-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-10-18 Perforation 1645.00 1645.30 3
1950-10-30 Acid Treatment 1579.50 1588.60 0
1950-12-14 Packing Device Capped w/Cement 1589.20 1589.20 0
1959-12-03 Cement Plug 1583.70 1589.20 0
1970-07-28 Perforation 1565.10 1569.70 7
1970-07-31 Acid Wash 1565.10 1569.70 0
1970-07-31 Acid Treatment 1565.10 1569.70 0
1972-07-18 Cement Squeeze 1565.10 1569.70 0
1950-10-18 Acid Wash 1645.00 1645.30 0
1950-10-19 Perforation 1645.00 1645.30 7
1950-10-19 Acid Wash 1645.00 1645.30 0
1950-10-22 Perforation 1645.00 1645.60 7
1950-10-22 Acid Wash 1645.00 1645.60 0
1950-10-24 Acid Wash 1645.00 1645.60 0
1950-10-27 Cement Plug 1606.30 1646.80 0
1950-10-28 Perforation 1579.50 1588.60 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8237 0.0 0.0 0.0
1968 8607 0.0 0.0 0.0
1969 7679 0.0 0.0 0.0
1970 768 0.0 0.0 0.0
1971 120 0.0 0.0 0.0

For data sources see[5]

References