X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260515000

Well Details

Well ID: 0504260515000
Loading map...
Location: 00/15-05-050-26W4/0
Location Alias: 00/15-05-50-26 W4M
Location Alias 2: 00/15-05-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 05
County/Municipality: Leduc County
Well Name: N.D. ET AL LEDUC 15-5-50-26
Operator Name: Northern Development Company Limited
License Number: 0004541
License Date: 1952-04-21
License Status: RecExempt
Spud Date: 1952-04-21
Final Drill Date: 1952-05-25
Well Total Depth: 1657.50 m
Surface Hole Latitude: 53.292616
Surface Hole Longitude: -113.765386

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-04-21 Obtained License
1952-05-01 Production Casing Operation Performed
1952-05-17 Drill Stem Test Performed
1952-05-19 Drill Stem Test Performed
1952-05-20 Drill Stem Test Performed
1952-05-21 Drill Stem Test Performed
1952-05-25 Drill Stem Test Performed
1952-05-25 Finished Drilling
1952-05-25 Well Mode changed to Drilled and Cased
1952-05-30 Perforation Treatment Performed - Bullet Perforation
1952-06-02 Perforation Treatment Performed - Bullet Perforation
1952-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-06-16 Well Began Production
1952-06-16 Well Fluid changed to Crude Oil
1952-06-16 Well Mode changed to Flowing
1954-02-16 Perforation Treatment Performed - Cement Plug
1954-02-28 Well Abandoned
1954-02-28 Well Fluid changed to Crude Oil
1954-02-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-05-30 Bullet Perforation 1579.50 1581.00 13
1952-05-30 Bullet Perforation 1582.50 1585.00 13
1952-06-02 Bullet Perforation 1590.40 1593.20 13
1952-06-02 Bullet Perforation 1583.10 1585.00 13
1952-06-05 Acid Treatment 1579.50 1593.20 0
1952-06-06 Acid Treatment 1579.50 1593.20 0
1952-06-10 Acid Treatment 1579.50 1593.20 0
1954-02-16 Cement Plug 1554.50 1592.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References