X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260513000

Well Details

Well ID: 0504260513000
Loading map...
Location: 00/13-05-050-26W4/0
Location Alias: 00/13-05-50-26 W4M
Location Alias 2: 00/13-05-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 05
County/Municipality: Leduc County
Well Name: CONTINENTAL LEDUC NO. 27
Operator Name: Westburne Petroleum & Minerals Ltd.
License Number: 0004634
License Date: 1952-05-09
License Status: RecCertified
Spud Date: 1952-05-19
Final Drill Date: 1952-06-12
Well Total Depth: 1656.00 m
Surface Hole Latitude: 53.291856
Surface Hole Longitude: -113.778627

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-05-09 Obtained License
1952-06-05 Drill Stem Test Performed
1952-06-08 Drill Stem Test Performed
1952-06-09 Drill Stem Test Performed
1952-06-12 Finished Drilling
1952-06-12 Well Mode changed to Drilled and Cased
1952-06-13 Drill Stem Test Performed
1952-06-15 Production Casing Operation Performed
1952-06-30 Perforation Treatment Performed - Acid Wash - No Pressure
1952-06-30 Perforation Treatment Performed - Bullet Perforation
1952-07-21 Well Began Production
1952-07-21 Well Fluid changed to Crude Oil
1952-07-21 Well Mode changed to Flowing
1955-01-14 Well Fluid changed to Crude Oil
1955-01-14 Well Mode changed to Pumping
1962-02-09 Perforation Treatment Performed - Cement Plug
1962-02-11 Perforation Treatment Performed - Jet Perforation
1962-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-14 Perforation Treatment Performed - Cement Plug
1969-10-25 Well Abandoned
1969-10-25 Well Fluid changed to Crude Oil
1969-10-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-06-30 Bullet Perforation 1579.20 1585.30 10
1952-06-30 Bullet Perforation 1586.50 1592.30 10
1952-06-30 Acid Wash 1579.20 1592.30 0
1952-06-30 Bullet Perforation 1592.60 1596.80 10
1962-02-09 Cement Plug 1587.10 1631.60 0
1962-02-11 Perforation 1579.20 1584.70 0
1962-02-12 Acid Treatment 1579.20 1584.70 0
1969-10-14 Cement Plug 1575.80 1587.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1968 168 0.0 0.0 0.0

For data sources see[5]

References