X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260316000

Well Details

Well ID: 0504260316000
Loading map...
Location: 00/16-03-050-26W4/0
Location Alias: 00/16-03-50-26 W4M
Location Alias 2: 00/16-03-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 03
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO. 9
Operator Name: Imperial Oil Resources Limited
License Number: B0001997
License Date: 1948-01-09
License Status: Abandoned
Spud Date: 1948-01-16
Final Drill Date: 1948-03-05
Well Total Depth: 1666.00 m
Surface Hole Latitude: 53.292347
Surface Hole Longitude: -113.711127

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-01-09 Obtained License
1948-01-29 Drill Stem Test Performed
1948-02-05 Drill Stem Test Performed
1948-02-20 Drill Stem Test Performed
1948-02-22 Drill Stem Test Performed
1948-02-28 Drill Stem Test Performed
1948-03-05 Drill Stem Test Performed
1948-03-05 Finished Drilling
1948-03-05 Well Mode changed to Drilled and Cased
1948-03-07 Production Casing Operation Performed
1948-03-11 Perforation Treatment Performed - Bullet Perforation
1948-03-13 Perforation Treatment Performed - Cement Squeeze
1948-03-16 Perforation Treatment Performed - Bullet Perforation
1948-03-16 Perforation Treatment Performed - Cement Squeeze
1948-03-20 Perforation Treatment Performed - Bullet Perforation
1948-03-20 Perforation Treatment Performed - Cement Squeeze
1948-03-23 Perforation Treatment Performed - Bullet Perforation
1948-03-24 Well Began Production
1948-03-24 Well Fluid changed to Crude Oil
1948-03-24 Well Mode changed to Flowing
1948-05-22 Drill Stem Test Performed
1973-03-29 Perforation Treatment Performed - Acid Wash - No Pressure
1986-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-10 Well Log Performed
1986-04-14 Perforation Treatment Performed - Cement Squeeze
1986-04-15 Well Log Performed
1986-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-17 Perforation Treatment Performed - Jet Perforation
1986-04-17 Well Log Performed
1986-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-22 Perforation Treatment Performed - Jet Perforation
1986-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-17 Well Fluid changed to Crude Oil
1990-10-17 Well Mode changed to Pumping
1996-05-01 Well Fluid changed to Crude Oil
1996-05-01 Well Mode changed to Suspended
1996-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-26 Perforation Treatment Performed - Jet Perforation
1996-08-26 Plug Back Performed
1996-08-26 Well Fluid changed to Crude Oil
1996-08-26 Well Mode changed to Abandoned Zone
1996-09-04 Perforation Treatment Performed - Remedial Casing
1996-09-25 Well Abandoned
1996-09-25 Well Fluid changed to Crude Oil
1996-09-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-03-11 Bullet Perforation 1645.90 1649.60 10
1986-04-14 Cement Squeeze 1649.00 1650.80 0
1986-04-17 Perforation 1647.80 1647.90 13
1986-04-17 Acid Treatment 1647.80 1647.90 0
1986-04-18 Acid Treatment 1647.80 1647.90 0
1986-04-22 Perforation 1647.30 1647.40 13
1986-04-23 Acid Treatment 1647.30 1647.40 0
1986-04-24 Acid Treatment 1647.30 1647.40 0
1996-08-26 Packing Device Capped w/Cement 1626.00 1634.00 0
1996-08-26 Packing Device Capped w/Cement 1263.00 1271.00 0
1996-08-26 Perforation 160.00 161.00 13
1948-03-13 Cement Squeeze 1645.90 1649.60 0
1996-09-04 Remedial Casing Cementing 160.00 161.00 0
1948-03-16 Bullet Perforation 1648.40 1650.80 10
1948-03-16 Cement Squeeze 1648.70 1655.10 0
1948-03-20 Bullet Perforation 1648.10 1648.70 10
1948-03-20 Cement Squeeze 1648.10 1648.70 0
1948-03-23 Bullet Perforation 1649.00 1650.80 10
1973-03-29 Acid Wash 1649.00 1650.80 0
1986-04-10 Acid Treatment 1649.00 1650.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 3760 0.0 0.0 0.0
1973 8495 0.0 0.0 0.0
1974 7268 0.0 0.0 0.0
1975 8328 0.0 0.0 0.0
1976 8599 0.0 0.0 0.0
1977 7965 0.0 0.0 0.0
1978 8543 0.0 0.0 0.0
1979 8471 0.0 0.0 0.0
1980 8257 0.0 0.0 0.0
1981 8483 0.0 0.0 0.0
1982 8063 0.0 0.0 0.0
1983 8235 0.0 0.0 0.0
1984 8087 0.0 0.0 0.0
1985 7552 0.0 0.0 0.0
1986 7617 0.0 0.0 0.0
1987 8237 0.0 0.0 0.0
1988 7845 0.0 0.0 0.0
1989 7430 0.0 0.0 0.0
1990 8722 0.0 0.0 0.0
1991 7470 0.0 0.0 0.0
1992 8460 0.0 0.0 0.0
1993 8512 0.0 0.0 0.0
1994 7626 0.0 0.0 0.0
1995 8428 0.0 0.0 0.0
1996 1376 0.0 0.0 0.0

For data sources see[5]

References