X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260307000

Well Details

Well ID: 0504260307000
Loading map...
Location: 00/07-03-050-26W4/0
Location Alias: 00/07-03-50-26 W4M
Location Alias 2: 00/07-03-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 03
County/Municipality: Leduc County
Well Name: HOME OIL-LEDUC NO. 23
Operator Name: Devon Canada Corporation
License Number: B0002217
License Date: 1948-07-23
License Status: RecCertified
Spud Date: 1948-07-31
Final Drill Date: 1948-09-06
Well Total Depth: 1646.80 m
Surface Hole Latitude: 53.285115
Surface Hole Longitude: -113.717143

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-07-23 Obtained License
1948-08-25 Drill Stem Test Performed
1948-08-26 Drill Stem Test Performed
1948-08-27 Drill Stem Test Performed
1948-08-28 Drill Stem Test Performed
1948-08-29 Drill Stem Test Performed
1948-09-03 Production Casing Operation Performed
1948-09-06 Finished Drilling
1948-09-06 Perforation Treatment Performed - Open-Hole Completion
1948-09-06 Well Mode changed to Drilled and Cased
1948-09-07 Well Began Production
1948-09-07 Well Fluid changed to Crude Oil
1948-09-07 Well Mode changed to Pumping
1989-10-23 Well Fluid changed to Crude Oil
1989-10-23 Well Mode changed to Suspended
1996-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-07 Plug Back Performed
1996-08-07 Well Fluid changed to Crude Oil
1996-08-07 Well Mode changed to Abandoned
1996-08-08 Perforation Treatment Performed - Jet Perforation
1996-09-04 Perforation Treatment Performed - Remedial Casing
1996-09-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-09-06 Open Hole/Barefoot Completion 1645.30 1646.80 0
1996-08-07 Packing Device Capped w/Cement 1627.00 1635.00 0
1996-08-07 Packing Device Capped w/Cement 1267.00 1275.00 0
1996-08-08 Perforation 160.00 161.00 13
1996-09-04 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4180 0.0 0.0 0.0
1972 3644 0.0 0.0 0.0
1973 8267 0.0 0.0 0.0
1974 7703 0.0 0.0 0.0
1975 7992 0.0 0.0 0.0
1976 8457 0.0 0.0 0.0
1977 8191 0.0 0.0 0.0
1978 8148 0.0 0.0 0.0
1979 8231 0.0 0.0 0.0
1980 8056 0.0 0.0 0.0
1981 7740 0.0 0.0 0.0
1982 8068 0.0 0.0 0.0
1983 8251 0.0 0.0 0.0
1984 7740 0.0 0.0 0.0
1985 8448 0.0 0.0 0.0
1986 6514 0.0 0.0 0.0
1987 8220 0.0 0.0 0.0
1988 7664 0.0 0.0 0.0
1989 5445 0.0 0.0 0.0

For data sources see[5]

References