X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504222612000

Well Details

Well ID: 0504222612000
Loading map...
Location: 00/12-26-050-22W4/0
Location Alias: 00/12-26-50-22 W4M
Location Alias 2: 00/12-26-050-22 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 22
Section: 26
County/Municipality: Leduc County
Well Name: NORCEN JOARCAM 12-26-50-22
Operator Name: Canadian Natural Resources Limited
License Number: 0004418
License Date: 1952-03-22
License Status: RecCertified
Spud Date: 1952-03-22
Final Drill Date: 1952-03-29
Well Total Depth: 1013.50 m
Surface Hole Latitude: 53.346487
Surface Hole Longitude: -113.120091

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-22 Obtained License
1952-03-27 Drill Stem Test Performed
1952-03-28 Drill Stem Test Performed
1952-03-29 Finished Drilling
1952-03-29 Well Mode changed to Drilled and Cased
1952-03-30 Drill Stem Test Performed
1952-03-30 Production Casing Operation Performed
1952-04-27 Perforation Treatment Performed - Bullet Perforation
1952-05-20 Well Began Production
1952-05-20 Well Fluid changed to Crude Oil
1952-05-20 Well Mode changed to Pumping
1980-10-11 Well Fluid changed to Crude Oil
1980-10-11 Well Mode changed to Suspended
1983-11-11 Well Log Performed
1983-11-14 Perforation Treatment Performed - Jet Perforation
1983-11-28 Well Fluid changed to Crude Oil
1983-11-28 Well Mode changed to Pumping
1986-09-01 Well Fluid changed to Crude Oil
1986-09-01 Well Mode changed to Suspended
1991-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-16 Perforation Treatment Performed - Jet Perforation
1991-09-16 Plug Back Performed
1991-09-16 Well Abandoned
1991-09-16 Well Fluid changed to Crude Oil
1991-09-16 Well Mode changed to Abandoned
1991-09-17 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-27 Bullet Perforation 1001.30 1001.60 20
1983-11-14 Perforation 998.80 999.80 13
1991-09-16 Packing Device Capped w/Cement 978.00 986.00 0
1991-09-16 Perforation 170.00 170.50 7
1991-09-17 Remedial Casing Cementing 170.00 170.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5807 0.0 0.0 0.0
1968 7370 0.0 0.0 0.0
1969 6335 0.0 0.0 0.0
1970 6216 0.0 0.0 0.0
1971 6346 0.0 0.0 0.0
1972 8699 0.0 0.0 0.0
1973 8711 0.0 0.0 0.0
1974 8519 0.0 0.0 0.0
1975 8639 0.0 0.0 0.0
1976 8520 0.0 0.0 0.0
1977 8687 0.0 0.0 0.0
1978 8543 0.0 0.0 0.0
1979 7800 0.0 0.0 0.0
1980 6287 0.0 0.0 0.0
1983 816 0.0 0.0 0.0
1984 8399 0.0 0.0 0.0
1985 8339 0.0 0.0 0.0
1986 4622 0.0 0.0 0.0

For data sources see[5]

References