If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504222412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.332203,"lon":-113.096584,"icon":""}]} |
Location: 00/12-24-050-22W4/0 | |
Location Alias: 00/12-24-50-22 W4M | |
Location Alias 2: 00/12-24-050-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 22 | |
Section: 24 | |
County/Municipality: Leduc County | |
Well Name: AMOCO JOARCAM 12-24-50-22 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0003709 | |
License Date: 1951-10-31 | |
License Status: RecExempt | |
Spud Date: 1951-11-10 | |
Final Drill Date: 1951-11-28 | |
Well Total Depth: 1006.10 m | |
Surface Hole Latitude: 53.332203 | |
Surface Hole Longitude: -113.096584 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-10-31 | Obtained License |
1951-11-25 | Drill Stem Test Performed |
1951-11-26 | Drill Stem Test Performed |
1951-11-27 | Drill Stem Test Performed |
1951-11-28 | Drill Stem Test Performed |
1951-11-28 | Finished Drilling |
1951-11-28 | Well Mode changed to Drilled and Cased |
1951-11-29 | Production Casing Operation Performed |
1951-12-04 | Perforation Treatment Performed - Jet Perforation |
1951-12-05 | Drill Stem Test Performed |
1951-12-06 | Perforation Treatment Performed - Acid Wash - No Pressure |
1951-12-07 | Perforation Treatment Performed - Cement Squeeze |
1951-12-11 | Perforation Treatment Performed - Jet Perforation |
1951-12-13 | Drill Stem Test Performed |
1952-01-01 | Well Began Production |
1952-01-01 | Well Fluid changed to Crude Oil |
1952-01-01 | Well Mode changed to Pumping |
1952-03-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1952-03-21 | Perforation Treatment Performed - Cement Squeeze |
1952-04-01 | Perforation Treatment Performed - Jet Perforation |
1952-04-03 | Drill Stem Test Performed |
1952-04-09 | Perforation Treatment Performed - Cement Squeeze |
1952-04-09 | Perforation Treatment Performed - Jet Perforation |
1952-04-10 | Perforation Treatment Performed - Jet Perforation |
1952-04-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1952-04-12 | Perforation Treatment Performed - Cement Squeeze |
1952-04-16 | Drill Stem Test Performed |
1952-04-19 | Drill Stem Test Performed |
1952-04-19 | Perforation Treatment Performed - Jet Perforation |
1952-05-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1952-05-19 | Well Fluid changed to Crude Oil |
1952-05-19 | Well Mode changed to Abandoned and Re-entered |
1955-08-17 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-12-04 | Perforation | 994.00 | 994.30 | 7 |
1952-04-10 | Perforation | 990.90 | 991.20 | 20 |
1952-04-11 | Acid Treatment | 990.90 | 991.20 | 0 |
1952-04-12 | Cement Squeeze | 990.90 | 991.20 | 0 |
1952-04-19 | Perforation | 990.60 | 990.90 | 10 |
1952-05-19 | Packing Device Capped w/Cement | 987.60 | 987.60 | 0 |
1951-12-06 | Acid Wash | 994.00 | 994.30 | 0 |
1951-12-07 | Cement Squeeze | 994.00 | 994.30 | 0 |
1951-12-11 | Perforation | 994.90 | 995.20 | 7 |
1952-03-21 | Acid Wash | 994.90 | 995.20 | 0 |
1952-03-21 | Cement Squeeze | 994.90 | 995.20 | 0 |
1952-04-01 | Perforation | 991.50 | 991.50 | 10 |
1952-04-09 | Perforation | 992.70 | 993.30 | 16 |
1952-04-09 | Cement Squeeze | 991.50 | 993.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]