X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504222301000

Well Details

Well ID: 0504222301000
Loading map...
Location: 00/01-23-050-22W4/0
Location Alias: 00/01-23-50-22 W4M
Location Alias 2: 00/01-23-050-22 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 22
Section: 23
County/Municipality: Leduc County
Well Name: CNRL JOARCAM 1-23-50-22
Operator Name: Canadian Natural Resources Limited
License Number: 0002291
License Date: 1951-06-25
License Status: Issued
Spud Date: 1951-07-09
Final Drill Date: 1951-07-13
Well Total Depth: 1015.00 m
Surface Hole Latitude: 53.324978
Surface Hole Longitude: -113.102039

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-25 Obtained License
1951-07-13 Finished Drilling
1951-07-13 Production Casing Operation Performed
1951-07-13 Well Mode changed to Drilled and Cased
1951-07-21 Perforation Treatment Performed - Jet Perforation
1951-08-14 Well Began Production
1951-08-14 Well Fluid changed to Crude Oil
1951-08-14 Well Mode changed to Pumping
1996-07-07 Perforation Treatment Performed - Cement Squeeze
1996-07-08 Perforation Treatment Performed - Jet Perforation
1997-02-14 Well Log Performed
1998-05-03 Perforation Treatment Performed - Cement Squeeze
1998-05-05 Perforation Treatment Performed - Jet Perforation
1998-05-05 Well Log Performed
1999-06-02 Perforation Treatment Performed - Jet Perforation
1999-06-02 Well Log Performed
2001-05-03 Perforation Treatment Performed - Cement Squeeze
2001-05-04 Perforation Treatment Performed - Jet Perforation
2001-05-04 Well Log Performed
2001-05-06 Perforation Treatment Performed - Jet Perforation
2001-05-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-07-21 Perforation 1000.70 1001.30 0
1996-07-07 Cement Squeeze 1000.70 1001.30 0
1996-07-08 Perforation 998.20 999.10 17
1998-05-03 Cement Squeeze 998.20 999.10 0
1998-05-05 Perforation 996.00 997.50 17
1999-06-02 Perforation 996.00 997.50 17
2001-05-03 Cement Squeeze 996.00 997.50 0
2001-05-04 Perforation 1003.00 1006.00 17
2001-05-06 Perforation 996.00 996.70 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 13 0.0 0.0 0.0
1968 121 0.0 0.0 0.0
1969 78 0.0 0.0 0.0
1970 130 0.0 0.0 0.0
1971 143 0.0 0.0 0.0
1972 298 0.0 0.0 0.0
1973 6144 0.0 0.0 0.0
1974 8592 0.0 0.0 0.0
1975 8759 0.0 0.0 0.0
1976 8783 0.0 0.0 0.0
1977 8759 0.0 0.0 0.0
1978 8567 0.0 0.0 0.0
1979 8519 0.0 0.0 0.0
1980 8735 0.0 0.0 0.0
1981 7703 0.0 0.0 0.0
1982 7804 0.0 0.0 0.0
1983 8663 0.0 0.0 0.0
1984 8749 0.0 0.0 0.0
1985 8423 0.0 0.0 0.0
1986 8752 0.0 0.0 0.0
1987 8686 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 8625 0.0 0.0 0.0
1990 8458 0.0 0.0 0.0
1991 8478 0.0 0.0 0.0
1992 8524 0.0 0.0 0.0
1993 8447 0.0 0.0 0.0
1994 7723 0.0 0.0 0.0
1996 3455 0.0 0.0 0.0
1997 7781 0.0 0.0 0.0
1998 7609 0.0 0.0 0.0
1999 4622 0.0 0.0 0.0
2000 7133 0.0 0.0 0.0
2001 8277 0.0 0.0 0.0
2002 7783 0.0 0.0 0.0
2003 7764 0.0 0.0 0.0
2004 8458 0.0 0.0 0.0
2005 7261 0.0 0.0 0.0
2006 8625 0.0 0.0 0.0
2007 8336 0.0 0.0 0.0
2008 8071 0.0 0.0 0.0
2009 8707 0.0 0.0 0.0
2010 8733 0.0 0.0 0.0
2011 8545 0.0 0.0 0.0
2012 8779 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 8699 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8753 0.0 0.0 0.0
2019 5330 0.0 0.0 0.0

For data sources see[5]

References