If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504011415A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.319001,"lon":-110.037599,"icon":""}]} |
Location: A0/15-14-050-01W4/0 | |
Location Alias: A0/15-14-50-01 W4M | |
Location Alias 2: A0/15-14-050-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 01 | |
Section: 14 | |
County/Municipality: County of Vermilion River | |
Well Name: MOBIL-GC LLOYD 15A-14-50-1 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0058025 | |
License Date: 1976-04-30 | |
License Status: RecCertified | |
Spud Date: 1976-05-11 | |
Final Drill Date: 1976-05-13 | |
Well Total Depth: 597.40 m | |
Surface Hole Latitude: 53.319001 | |
Surface Hole Longitude: -110.037599 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-04-30 | Obtained License |
1976-05-13 | Finished Drilling |
1976-05-13 | Well Mode changed to Drilled and Cased |
1976-05-14 | Production Casing Operation Performed |
1976-05-26 | Perforation Treatment Performed - Jet Perforation |
1976-05-28 | Well Began Production |
1976-05-28 | Well Fluid changed to Crude Oil |
1976-05-28 | Well Mode changed to Pumping |
1976-06-15 | Perforation Treatment Performed - Bullet Perforation |
1976-09-15 | Well Fluid changed to Crude Oil |
1976-09-15 | Well Mode changed to Suspended |
1987-10-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-10-19 | Plug Back Performed |
1987-10-19 | Well Abandoned |
1987-10-19 | Well Fluid changed to Crude Oil |
1987-10-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-05-26 | Perforation | 581.60 | 584.30 | 13 |
1976-06-15 | Bullet Perforation | 581.60 | 584.30 | 7 |
1987-10-19 | Packing Device Capped w/Cement | 575.00 | 575.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[5]