X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504010715A00

Well Details

Well ID: 0504010715A00
Loading map...
Location: A0/15-07-050-01W4/0
Location Alias: A0/15-07-50-01 W4M
Location Alias 2: A0/15-07-050-01 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 07
County/Municipality: County of Vermilion River
Well Name: LLOYDMINSTER DEVELOPMENT NO.14 WELL
Operator Name: Murphy Oil Company Ltd.
License Number: 0002031
License Date: 1950-09-14
License Status: RecCertified
Spud Date: 1950-09-23
Final Drill Date: 1950-09-28
Well Total Depth: 596.80 m
Surface Hole Latitude: 53.304356
Surface Hole Longitude: -110.135235

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-09-14 Obtained License
1950-09-28 Finished Drilling
1950-09-28 Well Mode changed to Drilled and Cased
1950-09-30 Production Casing Operation Performed
1950-11-07 Perforation Treatment Performed - Bullet Perforation
1950-11-09 Perforation Treatment Performed - Bullet Perforation
1950-11-12 Perforation Treatment Performed - Bullet Perforation
1950-11-15 Well Began Production
1950-11-15 Well Fluid changed to Crude Oil
1950-11-15 Well Mode changed to Pumping
1950-12-17 Perforation Treatment Performed - Jet Perforation
1980-02-01 Well Fluid changed to Crude Oil
1980-02-01 Well Mode changed to Suspended
1994-05-08 Perforation Treatment Performed - Cement Plug
1994-05-08 Plug Back Performed
1994-05-08 Well Abandoned
1994-05-08 Well Fluid changed to Crude Oil
1994-05-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-11-07 Bullet Perforation 594.10 595.00 13
1950-11-07 Bullet Perforation 589.80 590.70 13
1950-11-09 Bullet Perforation 594.70 595.60 13
1950-11-09 Bullet Perforation 590.40 591.30 13
1950-11-12 Bullet Perforation 594.10 595.90 7
1950-12-17 Perforation 589.50 591.00 7
1994-05-08 Cement Plug 0.10 592.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 3672 0.0 0.0 0.0
1970 8759 0.0 0.0 0.0
1971 8615 0.0 0.0 0.0
1972 8783 0.0 0.0 0.0
1973 7871 0.0 0.0 0.0
1974 6503 0.0 0.0 0.0
1975 5394 0.0 0.0 0.0
1976 8783 0.0 0.0 0.0
1977 8735 0.0 0.0 0.0
1978 3000 0.0 0.0 0.0
1979 936 0.0 0.0 0.0
1980 768 0.0 0.0 0.0

For data sources see[5]

References