X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495213410000

Well Details

Well ID: 0495213410000
Loading map...
Location: 00/10-34-049-21W5/0
Location Alias: 00/10-34-49-21 W5M
Location Alias 2: 00/10-34-049-21 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 21
Section: 34
County/Municipality: Yellowhead County
Well Name: MOBIL ICG EMBARRAS 10-34-49-21
Operator Name: ExxonMobil Canada Ltd.
License Number: 0048574
License Date: 1974-01-07
License Status: Re-Entered
Spud Date: 1974-01-08
Final Drill Date: 1974-06-15
Well Total Depth: 4785.40 m
Surface Hole Latitude: 53.273335
Surface Hole Longitude: -116.983838

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-01-07 Obtained License
1974-02-05 Lost Circulation Occurred
1974-02-18 Lost Circulation Occurred
1974-04-09 Lost Circulation Occurred
1974-05-08 Lost Circulation Occurred
1974-06-15 Finished Drilling
1974-06-15 Well Mode changed to Drilled and Cased
1974-06-24 Drill Stem Test Performed
1974-06-25 Perforation Treatment Performed - Jet Perforation
1974-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-01 Perforation Treatment Performed - Jet Perforation
1974-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-03 Drill Stem Test Performed
1974-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-20 Drill Stem Test Performed
1974-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-07-23 Perforation Treatment Performed - Jet Perforation
1974-07-23 Well Log Performed
1974-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-25 Drill Stem Test Performed
1974-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-07-29 Perforation Treatment Performed - Jet Perforation
1974-07-29 Well Log Performed
1974-07-30 Perforation Treatment Performed - Acid Wash - No Pressure
1974-07-31 Drill Stem Test Performed
1974-08-01 Drill Stem Test Performed
1974-08-02 Well Log Performed
1974-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-08-03 Perforation Treatment Performed - Jet Perforation
1974-08-05 Drill Stem Test Performed
1974-08-07 Drill Stem Test Performed
1974-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-08-08 Perforation Treatment Performed - Jet Perforation
1974-08-09 Drill Stem Test Performed
1974-08-10 Drill Stem Test Performed
1974-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-08-11 Perforation Treatment Performed - Jet Perforation
1974-08-12 Perforation Treatment Performed - Jet Perforation
1974-08-13 Perforation Treatment Performed - Cement Squeeze
1974-08-14 Perforation Treatment Performed - Jet Perforation
1974-08-15 Drill Stem Test Performed
1974-08-17 Drill Stem Test Performed
1974-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-12 Well Began Production
1974-10-12 Well Fluid changed to Crude Oil
1974-10-12 Well Mode changed to Pumping
1975-06-21 Well Fluid changed to Crude Oil
1975-06-21 Well Mode changed to Suspended
1982-12-01 Well Fluid changed to Crude Oil
1982-12-01 Well Mode changed to Pumping
1984-12-15 Well Fluid changed to Crude Oil
1984-12-15 Well Mode changed to Suspended
1991-01-10 Well Log Performed
1991-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-01-12 Perforation Treatment Performed - Jet Perforation
1991-01-12 Plug Back Performed
1991-01-12 Well Fluid changed to Crude Oil
1991-01-12 Well Log Performed
1991-01-12 Well Mode changed to Abandoned
1991-01-13 Well Fluid changed to Crude Oil
1991-01-13 Well Mode changed to Abandoned and Re-entered
1991-01-14 Perforation Treatment Performed - Remedial Casing
1991-01-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-06-25 Perforation 4739.60 4745.70 7
1974-07-23 Perforation 3781.70 3783.50 7
1974-07-23 Perforation 3786.20 3791.70 7
1974-07-23 Perforation 3799.00 3802.10 7
1974-07-23 Perforation 3808.20 3810.60 7
1974-07-24 Acid Treatment 3781.70 3810.60 0
1974-07-27 Acid Treatment 3781.70 3810.60 0
1974-07-29 Packing Device Capped w/Cement 3766.70 3771.90 0
1974-07-29 Perforation 3587.50 3592.70 7
1974-07-29 Perforation 3604.60 3607.00 7
1974-07-29 Perforation 3614.90 3620.10 7
1974-06-28 Acid Treatment 4739.60 4745.70 7
1974-07-30 Acid Wash 3587.50 3620.10 0
1974-08-03 Packing Device Capped w/Cement 3564.60 3572.30 0
1974-08-03 Perforation 3253.40 3257.10 7
1974-08-03 Perforation 3263.20 3265.30 7
1974-08-03 Perforation 3272.30 3275.40 7
1974-08-03 Perforation 3281.50 3285.70 7
1974-08-08 Packing Device Capped w/Cement 3221.70 3229.40 0
1974-08-08 Perforation 3114.40 3121.80 7
1974-08-10 Packing Device Capped w/Cement 3083.10 3090.70 0
1974-08-11 Perforation 2741.70 2746.90 7
1974-07-01 Perforation 4739.60 4745.70 7
1974-08-12 Perforation 2276.90 2277.50 13
1974-08-13 Cement Squeeze 2276.90 2277.50 0
1974-08-14 Perforation 2193.30 2200.70 7
1974-08-14 Perforation 2208.30 2211.30 7
1974-08-14 Perforation 2229.60 2240.90 7
1974-08-14 Perforation 2258.00 2260.10 7
1974-08-14 Perforation 2268.90 2272.00 7
1974-08-17 Acid Treatment 2193.30 2272.00 0
1991-01-12 Packing Device Capped w/Cement 2177.00 2185.00 0
1991-01-12 Perforation 597.00 599.00 13
1974-07-01 Perforation 4727.40 4733.50 7
1991-01-14 Remedial Casing Cementing 597.00 599.00 0
1974-07-01 Perforation 4718.30 4721.40 7
1974-07-02 Acid Treatment 4718.30 4745.70 0
1974-07-06 Acid Treatment 4718.30 4745.70 0
1974-07-20 Acid Treatment 4718.30 4745.70 0
1974-07-22 Packing Device Capped w/Cement 3829.80 3837.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1941 0.0 0.0 0.0
1975 3737 0.0 0.0 0.0
1982 744 0.0 0.0 0.0
1983 7171 0.0 0.0 0.0
1984 7096 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1974-02-05 Lost Circulation 982.60 982.60
1974-02-18 Lost Circulation 1240.50 1240.50
1974-04-09 Lost Circulation 2241.10 2241.10
1974-05-08 Lost Circulation 2145.10 3603.30

For data sources see[6]

References