X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495141201000

Well Details

Well ID: 0495141201000
Loading map...
Location: 00/01-12-049-14W5/0
Location Alias: 00/01-12-49-14 W5M
Location Alias 2: 00/01-12-049-14 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 14
Section: 12
County/Municipality: Yellowhead County
Well Name: MANCAL WESTPEM 1-12-49-14
Operator Name: Mancal Energy Inc.
License Number: 0437867
License Date: 2011-10-21
License Status: Suspension
Spud Date: 2011-11-10
Final Drill Date: 2011-11-29
Well Total Depth: 4065.00 m
Surface Hole Latitude: 53.225563
Surface Hole Longitude: -115.904135

For data sources see[1][2]

Well History

Date Event
2011-10-21 Obtained License
2011-11-11 Surface Casing Operation Performed
2011-11-12 Well Log Performed
2011-11-14 Direction Drilling Operation Performed - Horizontal
2011-11-24 Intermediate Casing Operation Performed
2011-11-24 Well Log Performed
2011-11-29 Finished Drilling
2011-11-29 Well Log Performed
2011-11-29 Well Mode changed to Drilled and Cased
2011-12-01 Perforation Treatment Performed - Open-Hole Completion
2011-12-01 Production Casing Operation Performed
2011-12-01 Rig Released
2011-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-11 Well Began Production
2012-02-11 Well Fluid changed to Gas
2012-02-11 Well Mode changed to Flowing
2015-05-01 Well Fluid changed to Gas
2015-05-01 Well Mode changed to Pumping
2016-03-01 Well Fluid changed to Gas
2016-03-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-14 1894.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-01 Open Hole/Barefoot Completion 4060.00 4065.00 0
2011-12-20 Multi-Stage Fracture 3160.90 3161.00 0
2011-12-21 Multi-Stage Fracture 3058.10 3058.20 0
2011-12-21 Multi-Stage Fracture 2938.90 2939.00 0
2011-12-21 Multi-Stage Fracture 2833.90 2834.00 0
2011-12-14 Multi-Stage Fracture 4031.90 4032.00 0
2011-12-14 Multi-Stage Fracture 3953.90 3954.00 0
2011-12-14 Multi-Stage Fracture 3835.60 3835.70 0
2011-12-14 Multi-Stage Fracture 3718.50 3718.60 0
2011-12-14 Multi-Stage Fracture 3612.70 3612.80 0
2011-12-14 Multi-Stage Fracture 3492.40 3492.50 0
2011-12-15 Multi-Stage Fracture 3387.10 3387.20 0
2011-12-20 Multi-Stage Fracture 3281.30 3281.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7261 0.0 0.0 0.0
2013 7710 0.0 0.0 0.0
2014 8232 0.0 0.0 0.0
2015 8545 0.0 0.0 0.0
2016 672 0.0 0.0 0.0

For data sources see[6]

References