X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495131901000

Well Details

Well ID: 0495131901000
Loading map...
Location: 00/01-19-049-13W5/0
Location Alias: 00/01-19-49-13 W5M
Location Alias 2: 00/01-19-049-13 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 13
Section: 19
County/Municipality: Yellowhead County
Well Name: RIDGEBACK WESTPEM 1-19-49-13
Operator Name: Ridgeback Resources Inc.
License Number: 0436573
License Date: 2011-09-06
License Status: Issued
Spud Date: 2011-10-01
Final Drill Date: 2011-10-13
Well Total Depth: 3717.00 m
Surface Hole Latitude: 53.240334
Surface Hole Longitude: -115.907906

For data sources see[1][2]

Well History

Date Event
2011-09-06 Obtained License
2011-10-03 Surface Casing Operation Performed
2011-10-04 Well Log Performed
2011-10-05 Direction Drilling Operation Performed - Horizontal
2011-10-07 Well Log Performed
2011-10-13 Finished Drilling
2011-10-13 Well Log Performed
2011-10-13 Well Mode changed to Drilled and Cased
2011-10-14 Perforation Treatment Performed - Open-Hole Completion
2011-10-14 Production Casing Operation Performed
2011-10-15 Rig Released
2011-10-20 Well Log Performed
2011-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-29 Well Began Production
2011-10-29 Well Fluid changed to Crude Oil
2011-10-29 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-05 1603.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-14 Open Hole/Barefoot Completion 3716.00 3717.00 0
2011-10-27 Multi-Stage Fracture 3143.90 3144.00 0
2011-10-27 Multi-Stage Fracture 3080.70 3080.80 0
2011-10-27 Multi-Stage Fracture 3019.80 3019.90 0
2011-10-27 Multi-Stage Fracture 2944.50 2944.60 0
2011-10-27 Multi-Stage Fracture 2881.60 2881.70 0
2011-10-28 Multi-Stage Fracture 2819.70 2819.80 0
2011-10-28 Multi-Stage Fracture 2743.90 2744.00 0
2011-10-28 Multi-Stage Fracture 2681.70 2681.80 0
2011-10-28 Multi-Stage Fracture 2607.40 2607.50 0
2011-10-28 Multi-Stage Fracture 2546.10 2546.20 0
2011-10-26 Multi-Stage Fracture 3690.20 3690.30 0
2011-10-28 Multi-Stage Fracture 2483.00 2483.10 0
2011-10-28 Multi-Stage Fracture 2408.30 2408.40 0
2011-10-26 Multi-Stage Fracture 3622.30 3622.40 0
2011-10-26 Multi-Stage Fracture 3546.30 3546.40 0
2011-10-26 Multi-Stage Fracture 3483.70 3483.80 0
2011-10-26 Multi-Stage Fracture 3421.00 3421.10 0
2011-10-26 Multi-Stage Fracture 3345.10 3345.20 0
2011-10-26 Multi-Stage Fracture 3282.40 3282.50 0
2011-10-27 Multi-Stage Fracture 3220.10 3220.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 872 0.0 0.0 0.0
2012 8129 0.0 0.0 0.0
2013 8245 0.0 0.0 0.0
2014 8051 0.0 0.0 0.0
2015 7700 0.0 0.0 0.0
2016 8172 0.0 0.0 0.0
2017 8059 0.0 0.0 0.0
2018 8348 0.0 0.0 0.0
2019 8176 0.0 0.0 0.0
2020 1979 0.0 0.0 0.0

For data sources see[6]

References