If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495131315000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.218989,"lon":-115.76327,"icon":""}]} |
Location: 00/15-13-049-13W5/0 | |
Location Alias: 00/15-13-49-13 W5M | |
Location Alias 2: 00/15-13-049-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 13 | |
Section: 13 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 15-13-49-13 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0435673 | |
License Date: 2011-08-03 | |
License Status: Issued | |
Spud Date: 2011-09-16 | |
Final Drill Date: 2011-09-26 | |
Well Total Depth: 3573.00 m | |
Surface Hole Latitude: 53.218989 | |
Surface Hole Longitude: -115.763270 |
Date | Event |
---|---|
2011-08-03 | Obtained License |
2011-09-17 | Surface Casing Operation Performed |
2011-09-18 | Well Log Performed |
2011-09-19 | Direction Drilling Operation Performed - Horizontal |
2011-09-20 | Well Log Performed |
2011-09-26 | Finished Drilling |
2011-09-26 | Well Log Performed |
2011-09-26 | Well Mode changed to Drilled and Cased |
2011-09-28 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-28 | Production Casing Operation Performed |
2011-09-28 | Rig Released |
2011-10-02 | Well Log Performed |
2011-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-21 | Well Began Production |
2011-10-21 | Well Fluid changed to Crude Oil |
2011-10-21 | Well Mode changed to Flowing |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-19 | 1529.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-28 | Open Hole/Barefoot Completion | 3544.00 | 3573.00 | 0 |
2011-10-19 | Multi-Stage Fracture | 2967.80 | 2967.90 | 0 |
2011-10-19 | Multi-Stage Fracture | 2907.30 | 2907.40 | 0 |
2011-10-19 | Multi-Stage Fracture | 2833.80 | 2833.90 | 0 |
2011-10-19 | Multi-Stage Fracture | 2760.40 | 2760.50 | 0 |
2011-10-19 | Multi-Stage Fracture | 2700.50 | 2700.60 | 0 |
2011-10-19 | Multi-Stage Fracture | 2625.80 | 2625.90 | 0 |
2011-10-19 | Multi-Stage Fracture | 2565.70 | 2565.80 | 0 |
2011-10-20 | Multi-Stage Fracture | 2494.00 | 2494.10 | 0 |
2011-10-20 | Multi-Stage Fracture | 2419.50 | 2419.60 | 0 |
2011-10-20 | Multi-Stage Fracture | 2359.00 | 2359.10 | 0 |
2011-10-19 | Multi-Stage Fracture | 3518.20 | 3518.30 | 0 |
2011-10-20 | Multi-Stage Fracture | 2285.40 | 2285.50 | 0 |
2011-10-20 | Multi-Stage Fracture | 2224.90 | 2225.00 | 0 |
2011-10-19 | Multi-Stage Fracture | 3449.10 | 3449.20 | 0 |
2011-10-19 | Multi-Stage Fracture | 3386.30 | 3386.40 | 0 |
2011-10-19 | Multi-Stage Fracture | 3311.90 | 3312.00 | 0 |
2011-10-19 | Multi-Stage Fracture | 3251.60 | 3251.70 | 0 |
2011-10-19 | Multi-Stage Fracture | 3177.10 | 3177.20 | 0 |
2011-10-19 | Multi-Stage Fracture | 3103.30 | 3103.40 | 0 |
2011-10-19 | Multi-Stage Fracture | 3042.20 | 3042.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1330 | 0.0 | 0.0 | 0.0 |
2012 | 8444 | 0.0 | 0.0 | 0.0 |
2013 | 8226 | 0.0 | 0.0 | 0.0 |
2014 | 7862 | 0.0 | 0.0 | 0.0 |
2015 | 8174 | 0.0 | 0.0 | 0.0 |
2016 | 8716 | 0.0 | 0.0 | 0.0 |
2017 | 8076 | 0.0 | 0.0 | 0.0 |
2018 | 8395 | 0.0 | 0.0 | 0.0 |
2019 | 8599 | 0.0 | 0.0 | 0.0 |
2020 | 1989 | 0.0 | 0.0 | 0.0 |
For data sources see[6]