X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495123501000

Well Details

Well ID: 0495123501000
Loading map...
Location: 00/01-35-049-12W5/0
Location Alias: 00/01-35-49-12 W5M
Location Alias 2: 00/01-35-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 35
County/Municipality: Yellowhead County
Well Name: SPARTAN PEMBINA 1-35-49-12
Operator Name: Obsidian Energy Ltd.
License Number: 0421256
License Date: 2010-06-18
License Status: Issued
Spud Date: 2010-07-29
Final Drill Date: 2010-08-11
Well Total Depth: 3300.00 m
Surface Hole Latitude: 53.266420
Surface Hole Longitude: -115.660450

For data sources see[1][2]

Well History

Date Event
2010-06-18 Obtained License
2010-07-31 Surface Casing Operation Performed
2010-08-03 Direction Drilling Operation Performed - Horizontal
2010-08-03 Well Log Performed
2010-08-11 Finished Drilling
2010-08-11 Well Mode changed to Drilled and Cased
2010-08-24 Production Casing Operation Performed
2010-08-24 Rig Released
2010-09-25 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-09-25 Perforation Treatment Performed - Fractured
2010-09-26 Perforation Treatment Performed - Fractured
2010-09-26 Perforation Treatment Performed - Jet Perforation
2010-09-27 Perforation Treatment Performed - Fractured
2010-09-27 Perforation Treatment Performed - Jet Perforation
2010-10-05 Well Fluid changed to Crude Oil
2010-10-05 Well Mode changed to Potential
2010-11-05 Well Began Production
2010-11-05 Well Fluid changed to Crude Oil
2010-11-05 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-03 1616.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-25 Hydra Jet Perforation 3250.00 3250.10 1
2010-09-25 Fracture 2776.00 2776.10 0
2010-09-25 Hydra Jet Perforation 2657.00 2657.10 1
2010-09-25 Fracture 2657.00 2657.10 0
2010-09-26 Perforation 2540.00 2541.00 15
2010-09-26 Perforation 2426.00 2427.00 15
2010-09-26 Fracture 2540.00 2541.00 0
2010-09-26 Fracture 2426.00 2427.00 0
2010-09-27 Perforation 2307.00 2308.00 15
2010-09-27 Perforation 2189.00 2190.00 15
2010-09-27 Fracture 2307.00 2308.00 0
2010-09-25 Fracture 3250.00 3250.10 0
2010-09-27 Fracture 2189.00 2190.00 0
2010-09-27 Perforation 2072.00 2073.00 15
2010-09-27 Perforation 1966.00 1967.00 15
2010-09-27 Fracture 2072.00 2073.00 0
2010-09-27 Fracture 1966.00 1967.00 0
2010-09-25 Hydra Jet Perforation 3135.00 3135.10 1
2010-09-25 Fracture 3135.00 3135.10 0
2010-09-25 Hydra Jet Perforation 3015.00 3015.10 1
2010-09-25 Fracture 3015.00 3015.10 0
2010-09-25 Hydra Jet Perforation 2910.00 2910.10 1
2010-09-25 Fracture 2910.00 2910.10 0
2010-09-25 Hydra Jet Perforation 2776.00 2776.10 1

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1308 0.0 0.0 0.0
2011 7286 0.0 0.0 0.0
2012 6464 0.0 0.0 0.0
2013 7731 0.0 0.0 0.0
2014 7664 0.0 0.0 0.0
2015 7808 0.0 0.0 0.0
2016 8688 0.0 0.0 0.0
2017 8603 0.0 0.0 0.0
2018 7256 0.0 0.0 0.0
2019 6460 0.0 0.0 0.0
2020 656 0.0 0.0 0.0

For data sources see[6]

References