X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495123312000

Well Details

Well ID: 0495123312000
Loading map...
Location: 00/12-33-049-12W5/0
Location Alias: 00/12-33-49-12 W5M
Location Alias 2: 00/12-33-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 33
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 12-33-49-12
Operator Name: Vermilion Energy Inc.
License Number: 0494966
License Date: 2019-06-24
License Status: Amended
Spud Date: 2020-02-16
Final Drill Date: 2020-02-28
Well Total Depth: 4500.00 m
Surface Hole Latitude: 53.279200
Surface Hole Longitude: -115.734996

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-16 Savanna Drilling Corp. 631 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-19 2050.00 Deviate (5 - 79 degrees)
2020-02-22 2556.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-04-02 Open Hole/Barefoot Completion 4495.00 4500.00 0
2020-04-03 Multi-Stage Fracture 3857.50 3857.60 0
2020-04-03 Multi-Stage Fracture 3789.00 3789.10 0
2020-04-03 Multi-Stage Fracture 3718.70 3718.80 0
2020-04-03 Multi-Stage Fracture 3635.30 3635.40 0
2020-04-03 Multi-Stage Fracture 3565.10 3565.20 0
2020-04-03 Multi-Stage Fracture 3483.00 3483.10 0
2020-04-03 Multi-Stage Fracture 3428.80 3428.90 0
2020-04-03 Multi-Stage Fracture 3332.30 3332.40 0
2020-04-04 Multi-Stage Fracture 3265.50 3265.60 0
2020-04-04 Multi-Stage Fracture 3155.70 3155.80 0
2020-04-03 Multi-Stage Fracture 4456.20 4456.30 0
2020-04-04 Multi-Stage Fracture 2952.60 2952.70 0
2020-04-04 Multi-Stage Fracture 2868.80 2868.90 0
2020-04-04 Multi-Stage Fracture 2798.50 2798.60 0
2020-04-04 Multi-Stage Fracture 2730.60 2730.70 0
2020-04-04 Multi-Stage Fracture 2662.40 2662.50 0
2020-04-04 Multi-Stage Fracture 2593.50 2593.60 0
2020-04-03 Multi-Stage Fracture 4384.20 4384.30 0
2020-04-03 Multi-Stage Fracture 4316.40 4316.50 0
2020-04-03 Multi-Stage Fracture 4232.30 4232.40 0
2020-04-03 Multi-Stage Fracture 4162.90 4163.00 0
2020-04-03 Multi-Stage Fracture 4093.20 4093.30 0
2020-04-03 Multi-Stage Fracture 4009.60 4009.70 0
2020-04-03 Multi-Stage Fracture 3953.30 3953.40 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-03-02 No Incident Encountered 0.00 0.00
2020-04-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References