If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495122702020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.268307,"lon":-115.665309,"icon":""}]} |
Location: 02/02-27-049-12W5/0 | |
Location Alias: 02/02-27-49-12 W5M | |
Location Alias 2: 02/02-27-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 27 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 2-27-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0436377 | |
License Date: 2011-08-29 | |
License Status: Issued | |
Spud Date: 2011-09-10 | |
Final Drill Date: 2011-09-22 | |
Well Total Depth: 3514.00 m | |
Surface Hole Latitude: 53.268307 | |
Surface Hole Longitude: -115.665309 |
Date | Event |
---|---|
2011-08-29 | Obtained License |
2011-09-11 | Surface Casing Operation Performed |
2011-09-11 | Well Log Performed |
2011-09-13 | Direction Drilling Operation Performed - Horizontal |
2011-09-15 | Well Log Performed |
2011-09-22 | Finished Drilling |
2011-09-22 | Well Mode changed to Drilled and Cased |
2011-09-24 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-24 | Production Casing Operation Performed |
2011-09-24 | Rig Released |
2011-10-19 | Well Log Performed |
2011-11-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-05 | Well Began Production |
2011-11-05 | Well Fluid changed to Crude Oil |
2011-11-05 | Well Mode changed to Flowing |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-13 | 1390.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-24 | Open Hole/Barefoot Completion | 3509.00 | 3514.00 | 0 |
2011-11-04 | Multi-Stage Fracture | 2929.70 | 2929.80 | 0 |
2011-11-04 | Multi-Stage Fracture | 2854.10 | 2854.20 | 0 |
2011-11-04 | Multi-Stage Fracture | 2793.20 | 2793.30 | 0 |
2011-11-04 | Multi-Stage Fracture | 2718.60 | 2718.70 | 0 |
2011-11-04 | Multi-Stage Fracture | 2657.10 | 2657.20 | 0 |
2011-11-04 | Multi-Stage Fracture | 2582.30 | 2582.40 | 0 |
2011-11-04 | Multi-Stage Fracture | 2508.00 | 2508.10 | 0 |
2011-11-04 | Multi-Stage Fracture | 2447.80 | 2447.90 | 0 |
2011-11-04 | Multi-Stage Fracture | 2371.90 | 2372.00 | 0 |
2011-11-04 | Multi-Stage Fracture | 2298.00 | 2298.10 | 0 |
2011-11-03 | Multi-Stage Fracture | 3485.80 | 3485.90 | 0 |
2011-11-04 | Multi-Stage Fracture | 2237.00 | 2237.10 | 0 |
2011-11-04 | Multi-Stage Fracture | 2162.40 | 2162.50 | 0 |
2011-11-03 | Multi-Stage Fracture | 3418.30 | 3418.40 | 0 |
2011-11-03 | Multi-Stage Fracture | 3342.60 | 3342.70 | 0 |
2011-11-03 | Multi-Stage Fracture | 3268.60 | 3268.70 | 0 |
2011-11-03 | Multi-Stage Fracture | 3206.40 | 3206.50 | 0 |
2011-11-03 | Multi-Stage Fracture | 3130.00 | 3130.10 | 0 |
2011-11-04 | Multi-Stage Fracture | 3067.80 | 3067.90 | 0 |
2011-11-04 | Multi-Stage Fracture | 2991.60 | 2991.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 672 | 0.0 | 0.0 | 0.0 |
2012 | 8500 | 0.0 | 0.0 | 0.0 |
2013 | 8349 | 0.0 | 0.0 | 0.0 |
2014 | 8523 | 0.0 | 0.0 | 0.0 |
2015 | 8656 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8714 | 0.0 | 0.0 | 0.0 |
2018 | 8743 | 0.0 | 0.0 | 0.0 |
2019 | 8673 | 0.0 | 0.0 | 0.0 |
2020 | 2176 | 0.0 | 0.0 | 0.0 |
For data sources see[6]