If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495122701000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.268307,"lon":-115.664859,"icon":""}]} |
Location: 00/01-27-049-12W5/0 | |
Location Alias: 00/01-27-49-12 W5M | |
Location Alias 2: 00/01-27-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 27 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 1-27-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0436378 | |
License Date: 2011-08-29 | |
License Status: Issued | |
Spud Date: 2011-09-25 | |
Final Drill Date: 2011-10-06 | |
Well Total Depth: 3511.00 m | |
Surface Hole Latitude: 53.268307 | |
Surface Hole Longitude: -115.664859 |
Date | Event |
---|---|
2011-08-29 | Obtained License |
2011-09-25 | Surface Casing Operation Performed |
2011-09-26 | Well Log Performed |
2011-09-27 | Well Log Performed |
2011-09-28 | Direction Drilling Operation Performed - Horizontal |
2011-10-06 | Finished Drilling |
2011-10-06 | Well Mode changed to Drilled and Cased |
2011-10-13 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-13 | Production Casing Operation Performed |
2011-10-13 | Rig Released |
2011-10-19 | Well Log Performed |
2011-11-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-09 | Well Began Production |
2011-11-09 | Well Fluid changed to Crude Oil |
2011-11-09 | Well Mode changed to Flowing |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-28 | 1424.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-13 | Open Hole/Barefoot Completion | 3508.30 | 3511.00 | 0 |
2011-11-07 | Multi-Stage Fracture | 2918.60 | 2918.70 | 0 |
2011-11-07 | Multi-Stage Fracture | 2858.00 | 2858.10 | 0 |
2011-11-08 | Multi-Stage Fracture | 2782.60 | 2782.70 | 0 |
2011-11-08 | Multi-Stage Fracture | 2720.60 | 2720.70 | 0 |
2011-11-08 | Multi-Stage Fracture | 2644.30 | 2644.40 | 0 |
2011-11-08 | Multi-Stage Fracture | 2582.60 | 2582.70 | 0 |
2011-11-08 | Multi-Stage Fracture | 2505.70 | 2505.80 | 0 |
2011-11-08 | Multi-Stage Fracture | 2443.40 | 2443.50 | 0 |
2011-11-08 | Multi-Stage Fracture | 2366.30 | 2366.40 | 0 |
2011-11-08 | Multi-Stage Fracture | 2305.50 | 2305.60 | 0 |
2011-11-07 | Multi-Stage Fracture | 3480.00 | 3480.10 | 0 |
2011-11-08 | Multi-Stage Fracture | 2228.40 | 2228.50 | 0 |
2011-11-08 | Multi-Stage Fracture | 2166.80 | 2166.90 | 0 |
2011-11-07 | Multi-Stage Fracture | 3411.10 | 3411.20 | 0 |
2011-11-07 | Multi-Stage Fracture | 3335.10 | 3335.20 | 0 |
2011-11-07 | Multi-Stage Fracture | 3272.80 | 3272.90 | 0 |
2011-11-07 | Multi-Stage Fracture | 3197.80 | 3197.90 | 0 |
2011-11-07 | Multi-Stage Fracture | 3135.10 | 3135.20 | 0 |
2011-11-07 | Multi-Stage Fracture | 3058.30 | 3058.40 | 0 |
2011-11-07 | Multi-Stage Fracture | 2995.50 | 2995.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 672 | 0.0 | 0.0 | 0.0 |
2012 | 8498 | 0.0 | 0.0 | 0.0 |
2013 | 8038 | 0.0 | 0.0 | 0.0 |
2014 | 8267 | 0.0 | 0.0 | 0.0 |
2015 | 8731 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8713 | 0.0 | 0.0 | 0.0 |
2018 | 8745 | 0.0 | 0.0 | 0.0 |
2019 | 8681 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]