X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495121613000

Well Details

Well ID: 0495121613000
Loading map...
Location: 00/13-16-049-12W5/0
Location Alias: 00/13-16-49-12 W5M
Location Alias 2: 00/13-16-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 16
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 13-16-49-12
Operator Name: Vermilion Energy Inc.
License Number: 0469717
License Date: 2014-09-09
License Status: Issued
Spud Date: 2014-11-01
Final Drill Date: 2014-11-20
Well Total Depth: 3863.00 m
Surface Hole Latitude: 53.234543
Surface Hole Longitude: -115.682613

For data sources see[1][2]

Well History

Date Event
2014-09-09 Obtained License
2014-11-01 Surface Casing Operation Performed
2014-11-06 Direction Drilling Operation Performed - Deviate
2014-11-08 Intermediate Casing Operation Performed
2014-11-10 Direction Drilling Operation Performed - Horizontal
2014-11-19 Well Log Performed
2014-11-20 Finished Drilling
2014-11-20 Production Casing Operation Performed
2014-11-20 Well Mode changed to Drilled and Cased
2014-11-21 Rig Released
2014-12-12 Perforation Treatment Performed - Open-Hole Completion
2014-12-13 Perforation Treatment Performed - Multi-Stage Fracture
2014-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-01 Well Fluid changed to Gas
2015-01-01 Well Mode changed to Testing
2015-02-01 Well Began Production
2015-02-01 Well Fluid changed to Gas
2015-02-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-01 Ironhand Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-06 2201.80 Deviate (5 - 79 degrees)
2014-11-10 2566.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-12 Open Hole/Barefoot Completion 3859.00 3863.00 0
2014-12-14 Multi-Stage Fracture 3087.90 3088.00 0
2014-12-14 Multi-Stage Fracture 2997.80 2997.90 0
2014-12-14 Multi-Stage Fracture 2923.10 2923.20 0
2014-12-14 Multi-Stage Fracture 2847.70 2847.80 0
2014-12-14 Multi-Stage Fracture 2743.80 2743.90 0
2014-12-14 Multi-Stage Fracture 2638.80 2638.90 0
2014-12-13 Multi-Stage Fracture 3835.60 3835.70 0
2014-12-13 Multi-Stage Fracture 3785.40 3785.50 0
2014-12-13 Multi-Stage Fracture 3710.70 3710.80 0
2014-12-13 Multi-Stage Fracture 3635.70 3635.80 0
2014-12-13 Multi-Stage Fracture 3442.20 3442.30 0
2014-12-14 Multi-Stage Fracture 3354.40 3354.50 0
2014-12-14 Multi-Stage Fracture 3267.10 3267.20 0
2014-12-14 Multi-Stage Fracture 3164.20 3164.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-12-13 2014-12-14 2,465 3,540 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 6.6477 N/A
water Not Available 100 85.9582 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 8.2831 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4392 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.027 N/A
dibromoacetonitrile 3252-43-5 100 0.027 N/A
non-hazardous ingredients Not Available 100 0.027 N/A
polyethylene glycol 25322-68-3 100 0.027 N/A
sodium bromide 7647-15-6 100 0.027 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0006 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1823 N/A
water Not Available 100 0.1823 N/A
FE-1 Trican Conductivity Enhancer citrus terpenes 68647-72-3 100 0.0672 N/A
isopropanol 67-63-0 100 0.0672 N/A
non-hazardous ingredients Not Available 100 0.0672 N/A
triethylene glycol 112-27-6 100 0.0672 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0289 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0289 N/A
non-hazardous ingredients Not Available 100 0.0289 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0882 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0262 N/A
SS-7 Trican Surfactant aliphatic alcohol 1111 100 0.0571 N/A
aminofunctional polymer 1111 100 0.0571 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0571 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-12-09 2014-12-14 Surface Water - Runoff 4260

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 569 0.0 0.0 0.0
2016 8242 0.0 0.0 0.0
2017 7911 0.0 0.0 0.0
2018 8221 0.0 0.0 0.0
2019 8587 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-21 No Incident Encountered 0.00 0.00
2014-12-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References