X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495121608000

Well Details

Well ID: 0495121608000
Loading map...
Location: 00/08-16-049-12W5/0
Location Alias: 00/08-16-49-12 W5M
Location Alias 2: 00/08-16-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 16
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 8-16-49-12
Operator Name: Vermilion Energy Inc.
License Number: 0459452
License Date: 2013-09-18
License Status: Issued
Spud Date: 2013-11-10
Final Drill Date: 2013-11-27
Well Total Depth: 3841.00 m
Surface Hole Latitude: 53.225565
Surface Hole Longitude: -115.709165

For data sources see[1][2]

Well History

Date Event
2013-09-18 Obtained License
2013-11-11 Surface Casing Operation Performed
2013-11-14 Direction Drilling Operation Performed - Deviate
2013-11-17 Well Log Performed
2013-11-18 Intermediate Casing Operation Performed
2013-11-19 Direction Drilling Operation Performed - Horizontal
2013-11-27 Finished Drilling
2013-11-27 Well Mode changed to Drilled and Cased
2013-11-28 Production Casing Operation Performed
2013-11-29 Rig Released
2013-12-01 Well Began Production
2013-12-01 Well Fluid changed to Gas
2013-12-01 Well Mode changed to Flowing
2013-12-05 Perforation Treatment Performed - Open-Hole Completion
2013-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-04 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-10 Ironhand Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-14 1939.00 Deviate (5 - 79 degrees)
2013-11-19 2638.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-12-05 Open Hole/Barefoot Completion 3835.00 3841.00 0
2013-12-09 Multi-Stage Fracture 3107.40 3107.50 0
2013-12-09 Multi-Stage Fracture 3004.70 3004.80 0
2013-12-09 Multi-Stage Fracture 2915.10 2915.20 0
2013-12-09 Multi-Stage Fracture 2824.80 2824.90 0
2013-12-09 Multi-Stage Fracture 2735.60 2735.70 0
2013-12-09 Multi-Stage Fracture 2660.80 2660.90 0
2013-12-06 Multi-Stage Fracture 3811.60 3811.70 0
2013-12-06 Multi-Stage Fracture 3747.00 3747.10 0
2013-12-09 Multi-Stage Fracture 3657.50 3657.60 0
2013-12-09 Multi-Stage Fracture 3568.80 3568.90 0
2013-12-09 Multi-Stage Fracture 3479.80 3479.90 0
2013-12-09 Multi-Stage Fracture 3375.20 3375.30 0
2013-12-09 Multi-Stage Fracture 3286.20 3286.30 0
2013-12-09 Multi-Stage Fracture 3196.60 3196.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-06 2013-12-09 2,446 1,891 N/A
2 2013-12-09 2013-12-09 2,446 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 6.4771 N/A
water Not Available 100 76.6564 N/A
Prime Plus (30/50) Trican hexamethylenetetramine 100-97-0 100 5.1779 N/A
silica crystalline 14808-60-7 100 5.1779 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 12.7402 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 0.5398 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.4864 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0095 N/A
dibromoacetonitrile 3252-43-5 100 0.0095 N/A
non-hazardous ingredients Not Available 100 0.0095 N/A
polyethylene glycol 25322-68-3 100 0.0095 N/A
sodium bromide 7647-15-6 100 0.0095 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0251 N/A
cured acrylic resin Not Available 100 0.0251 N/A
silica crystalline 14808-60-7 100 0.0251 N/A
DRA-90 Trican Buffer non-hazardous ingredients Not Available 100 0.1588 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1678 N/A
formic acid 64-18-6 100 0.1678 N/A
non-hazardous ingredients Not Available 100 0.1678 N/A
FE-1 Trican Conductivity Enhancer citrus terpenes 94266-47-4 100 0.1451 N/A
isopropanol 67-63-0 100 0.1451 N/A
non-hazardous ingredients Not Available 100 0.1451 N/A
triethylene glycol 112-27-6 100 0.1451 N/A
WXB-77 (Cross linker) Borate Trican Crosslinker borate salts 1319-33-1 100 0.384 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.384 N/A
WG-111L Rapid Gellant Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.4415 N/A
polysaccharide blend Not Available 100 0.4415 N/A
2 WBE-1:5 Trican Breaker ethylene glycol 107-21-1 100 0.0132 N/A
non-hazardous ingredients Not Available 100 0.0132 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-12-03 2013-12-05 Groundwater - Non-saline less than or equal to 150m deep 2130

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1 0.0 0.0 0.0
2014 8526 0.0 0.0 0.0
2015 8447 0.0 0.0 0.0
2016 8522 0.0 0.0 0.0
2017 7886 0.0 0.0 0.0
2018 8722 0.0 0.0 0.0
2019 8453 0.0 0.0 0.0
2020 2146 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-29 No Incident Encountered 0.00 0.00
2014-01-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References