X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495121111000

Well Details

Well ID: 0495121111000
Loading map...
Location: 00/11-11-049-12W5/0
Location Alias: 00/11-11-49-12 W5M
Location Alias 2: 00/11-11-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 11
County/Municipality: Yellowhead County
Well Name: 1107882 ACC WESTPEM 5-11-49-12
Operator Name: Obsidian Energy Ltd.
License Number: 0072825
License Date: 1978-11-06
License Status: Amended
Spud Date: 1978-11-16
Final Drill Date: 1979-01-08
Well Total Depth: 3125.00 m
Surface Hole Latitude: 53.216600
Surface Hole Longitude: -115.651177

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-06 Obtained License
1978-12-27 Drill Stem Test Performed
1978-12-28 Drill Stem Test Performed
1979-01-08 Finished Drilling
1979-01-08 Well Mode changed to Drilled and Cased
1979-01-12 Production Casing Operation Performed
1979-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-02-19 Perforation Treatment Performed - Jet Perforation
1979-02-20 Well Began Production
1979-02-20 Well Fluid changed to Crude Oil
1979-02-20 Well Mode changed to Flowing
1981-01-27 Well Fluid changed to Crude Oil
1981-01-27 Well Mode changed to Suspended
1981-01-28 Well Began Injection
1981-01-28 Well Fluid changed to Water
1981-01-28 Well Type changed to Injection
1981-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-01 Perforation Treatment Performed - Jet Perforation
1982-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-10-18 Perforation Treatment Performed - Jet Perforation
1983-01-01 Well Fluid changed to Water
1983-01-01 Well Mode changed to Suspended
1983-01-01 Well Type changed to Injection
1983-02-01 Well Fluid changed to Crude Oil
1983-02-01 Well Mode changed to Flowing
1983-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-02-11 Perforation Treatment Performed - Jet Perforation
1983-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-22 Well Fluid changed to Crude Oil
1983-02-22 Well Mode changed to Suspended
1984-04-18 Well Fluid changed to Gas
1984-04-18 Well Type changed to Injection
1987-10-10 Perforation Treatment Performed - Chemical Squeeze
1987-10-21 Well Log Performed
1987-11-27 Perforation Treatment Performed - Chemical Squeeze
1988-07-31 Well Log Performed
1988-08-01 Perforation Treatment Performed - Jet Perforation
1988-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-16 Perforation Treatment Performed - Chemical Squeeze
1990-06-18 Perforation Treatment Performed - Jet Perforation
1990-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-06 Well Log Performed
1990-12-21 Well Fluid changed to Gas
1990-12-21 Well Mode changed to Suspended
1990-12-21 Well Type changed to Injection
1991-01-17 Well Log Performed
1991-01-25 Perforation Treatment Performed - Cement Squeeze
1991-01-31 Well Log Performed
1991-02-09 Perforation Treatment Performed - Jet Perforation
1991-02-12 Well Log Performed
1991-02-14 Well Log Performed
1991-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-18 Well Fluid changed to Crude Oil
1991-05-18 Well Mode changed to Flowing
1991-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-19 Well Log Performed
1997-04-01 Well Log Performed
1997-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-11 Plug Back Performed
1997-06-12 Well Fluid changed to Crude Oil
1997-06-12 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-02-19 Perforation 3072.50 3079.00 13
1983-02-12 Acid Treatment 2980.00 2990.00 0
1987-10-10 Chemical Squeeze 2980.00 2990.00 0
1987-11-27 Chemical Squeeze 2980.00 2990.00 0
1988-08-01 Perforation 2992.00 2997.90 20
1988-08-02 Acid Treatment 2992.00 2997.90 0
1990-06-16 Chemical Squeeze 2980.00 2997.90 0
1990-06-18 Perforation 2998.00 3002.00 20
1990-06-19 Acid Treatment 2980.00 3002.00 0
1991-01-25 Cement Squeeze 2980.00 3002.00 0
1991-02-09 Perforation 3055.00 3060.00 13
1979-02-19 Acid Treatment 3072.50 3079.30 0
1991-02-09 Perforation 3061.50 3068.00 13
1991-02-09 Perforation 3072.50 3079.00 13
1991-05-08 Acid Treatment 3055.00 3060.00 0
1991-05-09 Acid Treatment 3055.00 3060.00 0
1991-05-22 Acid Treatment 3055.00 3060.00 0
1991-06-27 Acid Treatment 3061.50 3068.00 0
1991-08-21 Acid Treatment 3072.50 3079.00 0
1997-06-11 Packing Device Capped w/Cement 3043.00 3051.00 0
1981-06-29 Acid Treatment 3072.50 3079.30 0
1982-06-01 Perforation 3061.50 3068.00 13
1982-06-02 Acid Treatment 3061.50 3079.30 0
1982-10-18 Perforation 3055.00 3060.00 13
1982-10-18 Acid Treatment 3055.00 3079.30 0
1983-02-10 Packing Device Capped w/Cement 3040.60 3040.60 0
1983-02-11 Perforation 2980.00 2990.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 5815 0.0 0.0 0.0
1980 7341 0.0 0.0 0.0
1981 414 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 181 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 3023 0.0 0.0 0.0
1992 4764 0.0 0.0 0.0
1993 777 0.0 0.0 0.0
1996 3907 0.0 0.0 0.0
1997 34 0.0 0.0 0.0

For data sources see[5]

References