X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495121108020

Well Details

Well ID: 0495121108020
Loading map...
Location: 02/08-11-049-12W5/0
Location Alias: 02/08-11-49-12 W5M
Location Alias 2: 02/08-11-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 11
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 8-11-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0429635
License Date: 2011-01-07
License Status: Issued
Spud Date: 2011-01-20
Final Drill Date: 2011-01-30
Well Total Depth: 3460.00 m
Surface Hole Latitude: 53.210253
Surface Hole Longitude: -115.662047

For data sources see[1][2]

Well History

Date Event
2011-01-07 Obtained License
2011-01-21 Surface Casing Operation Performed
2011-01-24 Direction Drilling Operation Performed - Horizontal
2011-01-30 Finished Drilling
2011-01-30 Perforation Treatment Performed - Open-Hole Completion
2011-01-30 Well Log Performed
2011-01-30 Well Mode changed to Drilled and Cased
2011-02-01 Liner Casing Operation Performed
2011-02-01 Production Casing Operation Performed
2011-02-02 Rig Released
2011-02-16 Well Log Performed
2011-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-08 Well Began Production
2011-03-08 Well Fluid changed to Crude Oil
2011-03-08 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-24 1537.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-30 Open Hole/Barefoot Completion 3455.00 3460.00 0
2011-03-04 Multi-Stage Fracture 2896.70 2896.80 0
2011-03-04 Multi-Stage Fracture 2833.60 2833.70 0
2011-03-04 Multi-Stage Fracture 2758.70 2758.80 0
2011-03-04 Multi-Stage Fracture 2695.20 2695.30 0
2011-03-04 Multi-Stage Fracture 2632.00 2632.10 0
2011-03-04 Multi-Stage Fracture 2568.70 2568.80 0
2011-03-04 Multi-Stage Fracture 2493.80 2493.90 0
2011-03-04 Multi-Stage Fracture 2430.60 2430.70 0
2011-03-04 Multi-Stage Fracture 2367.40 2367.50 0
2011-03-04 Multi-Stage Fracture 2304.20 2304.30 0
2011-03-03 Multi-Stage Fracture 3420.10 3420.20 0
2011-03-04 Multi-Stage Fracture 2230.20 2230.30 0
2011-03-04 Multi-Stage Fracture 2167.70 2167.80 0
2011-03-03 Multi-Stage Fracture 3350.00 3350.10 0
2011-03-03 Multi-Stage Fracture 3287.40 3287.50 0
2011-03-03 Multi-Stage Fracture 3225.10 3225.20 0
2011-03-03 Multi-Stage Fracture 3161.70 3161.80 0
2011-03-03 Multi-Stage Fracture 3098.50 3098.60 0
2011-03-03 Multi-Stage Fracture 3023.40 3023.50 0
2011-03-04 Multi-Stage Fracture 2960.10 2960.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4838 0.0 0.0 0.0
2012 8583 0.0 0.0 0.0
2013 8548 0.0 0.0 0.0
2014 8549 0.0 0.0 0.0
2015 8066 0.0 0.0 0.0
2016 8539 0.0 0.0 0.0
2017 8603 0.0 0.0 0.0
2018 8740 0.0 0.0 0.0
2019 8672 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[6]

References