X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495121101030

Well Details

Well ID: 0495121101030
Loading map...
Location: 03/01-11-049-12W5/0
Location Alias: 03/01-11-49-12 W5M
Location Alias 2: 03/01-11-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 11
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 1-11-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0425668
License Date: 2010-11-09
License Status: Issued
Spud Date: 2010-11-23
Final Drill Date: 2010-12-04
Well Total Depth: 3507.00 m
Surface Hole Latitude: 53.209983
Surface Hole Longitude: -115.662047

For data sources see[1][2]

Well History

Date Event
2010-11-09 Obtained License
2010-11-24 Surface Casing Operation Performed
2010-11-25 Well Log Performed
2010-11-26 Direction Drilling Operation Performed - Horizontal
2010-12-04 Finished Drilling
2010-12-04 Perforation Treatment Performed - Open-Hole Completion
2010-12-04 Well Mode changed to Drilled and Cased
2010-12-06 Liner Casing Operation Performed
2010-12-06 Production Casing Operation Performed
2010-12-07 Rig Released
2010-12-15 Well Log Performed
2011-03-04 Well Began Production
2011-03-04 Well Fluid changed to Crude Oil
2011-03-04 Well Mode changed to Pumping
2011-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-12 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-26 1515.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-04 Open Hole/Barefoot Completion 3502.00 3507.00 0
2011-03-11 Multi-Stage Fracture 2913.20 2913.30 0
2011-03-11 Multi-Stage Fracture 2841.10 2841.20 0
2011-03-12 Multi-Stage Fracture 2773.10 2773.20 0
2011-03-12 Multi-Stage Fracture 2705.90 2706.00 0
2011-03-12 Multi-Stage Fracture 2633.60 2633.70 0
2011-03-12 Multi-Stage Fracture 2562.80 2562.90 0
2011-03-12 Multi-Stage Fracture 2502.60 2502.70 0
2011-03-12 Multi-Stage Fracture 2432.60 2432.70 0
2011-03-11 Multi-Stage Fracture 3477.90 3478.00 0
2011-03-11 Multi-Stage Fracture 3401.60 3401.70 0
2011-03-11 Multi-Stage Fracture 3330.20 3330.30 0
2011-03-11 Multi-Stage Fracture 3261.30 3261.40 0
2011-03-11 Multi-Stage Fracture 3201.70 3201.80 0
2011-03-11 Multi-Stage Fracture 3129.00 3129.10 0
2011-03-11 Multi-Stage Fracture 3057.50 3057.60 0
2011-03-11 Multi-Stage Fracture 2986.50 2986.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4829 0.0 0.0 0.0
2012 8430 0.0 0.0 0.0
2013 8588 0.0 0.0 0.0
2014 8688 0.0 0.0 0.0
2015 7996 0.0 0.0 0.0
2016 8456 0.0 0.0 0.0
2017 8592 0.0 0.0 0.0
2018 8721 0.0 0.0 0.0
2019 8379 0.0 0.0 0.0
2020 2058 0.0 0.0 0.0

For data sources see[6]

References