If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495121016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.205067,"lon":-115.665397,"icon":""}]} |
Location: 00/16-10-049-12W5/0 | |
Location Alias: 00/16-10-49-12 W5M | |
Location Alias 2: 00/16-10-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 10 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 16-10-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0464641 | |
License Date: 2014-02-04 | |
License Status: Issued | |
Spud Date: 2014-02-19 | |
Final Drill Date: 2014-02-28 | |
Well Total Depth: 3530.00 m | |
Surface Hole Latitude: 53.205067 | |
Surface Hole Longitude: -115.665397 |
Date | Event |
---|---|
2014-02-04 | Obtained License |
2014-02-20 | Surface Casing Operation Performed |
2014-02-22 | Direction Drilling Operation Performed - Deviate |
2014-02-22 | Direction Drilling Operation Performed - Horizontal |
2014-02-23 | Well Log Performed |
2014-02-28 | Finished Drilling |
2014-02-28 | Well Log Performed |
2014-02-28 | Well Mode changed to Drilled and Cased |
2014-03-02 | Production Casing Operation Performed |
2014-03-03 | Perforation Treatment Performed - Open-Hole Completion |
2014-03-03 | Rig Released |
2014-03-06 | Well Log Performed |
2014-04-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-05 | Well Began Production |
2014-04-05 | Well Fluid changed to Crude Oil |
2014-04-05 | Well Mode changed to Flowing |
2014-04-08 | Well Log Performed |
2014-05-02 | Well Fluid changed to Crude Oil |
2014-05-02 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-02-19 | Ensign Drilling Inc. | 360 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-22 | 1592.80 | Deviate (5 - 79 degrees) |
2014-02-22 | 2058.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-03-03 | Open Hole/Barefoot Completion | 3526.00 | 3530.00 | 0 |
2014-04-05 | Multi-Stage Fracture | 2943.70 | 2943.80 | 0 |
2014-04-05 | Multi-Stage Fracture | 2883.40 | 2883.50 | 0 |
2014-04-05 | Multi-Stage Fracture | 2809.40 | 2809.50 | 0 |
2014-04-05 | Multi-Stage Fracture | 2749.10 | 2749.20 | 0 |
2014-04-05 | Multi-Stage Fracture | 2675.10 | 2675.20 | 0 |
2014-04-05 | Multi-Stage Fracture | 2601.00 | 2601.10 | 0 |
2014-04-05 | Multi-Stage Fracture | 2540.80 | 2540.90 | 0 |
2014-04-05 | Multi-Stage Fracture | 2466.70 | 2466.80 | 0 |
2014-04-05 | Multi-Stage Fracture | 2392.60 | 2392.70 | 0 |
2014-04-05 | Multi-Stage Fracture | 2332.40 | 2332.50 | 0 |
2014-04-04 | Multi-Stage Fracture | 3500.90 | 3501.00 | 0 |
2014-04-05 | Multi-Stage Fracture | 2272.20 | 2272.30 | 0 |
2014-04-05 | Multi-Stage Fracture | 2198.10 | 2198.20 | 0 |
2014-04-04 | Multi-Stage Fracture | 3420.00 | 3420.10 | 0 |
2014-04-04 | Multi-Stage Fracture | 3359.70 | 3359.80 | 0 |
2014-04-04 | Multi-Stage Fracture | 3286.20 | 3286.30 | 0 |
2014-04-04 | Multi-Stage Fracture | 3198.30 | 3198.40 | 0 |
2014-04-04 | Multi-Stage Fracture | 3151.90 | 3152.00 | 0 |
2014-04-04 | Multi-Stage Fracture | 3078.00 | 3078.10 | 0 |
2014-04-04 | Multi-Stage Fracture | 3017.70 | 3017.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-04 | 2014-04-05 | 1,897 | 2,709 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 81.2809 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 3.262 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.0518 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.0981 | N/A | ||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0139 | N/A | |
Water | 7732-18-5 | 100 | 0.0149 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1837 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0856 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0881 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0857 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1058 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0856 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0873 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0881 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 6.2441 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0621 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-03-29 | 2014-03-30 | Surface Water - Runoff | 750 |
2014-04-03 | 2014-04-04 | Surface Water - River | 300 |
2014-03-30 | 2014-03-30 | Recycled Fracturing Water (treated at well site) | 1595 |
2014-04-01 | 2014-04-02 | Recycled Fracturing Water (treated at well site) | 315 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 5890 | 0.0 | 0.0 | 0.0 |
2015 | 8647 | 0.0 | 0.0 | 0.0 |
2016 | 8755 | 0.0 | 0.0 | 0.0 |
2017 | 8450 | 0.0 | 0.0 | 0.0 |
2018 | 8685 | 0.0 | 0.0 | 0.0 |
2019 | 8749 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-03 | No Incident Encountered | 0.00 | 0.00 |
2014-04-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]